Sự thi công
Mt. Tabor Maintenance Yard Project
Parks
Under Construction
Construction started in October 2021, with expected completion in Summer 2024
Mt. Tabor Yard serves as the central dispatch for PP&R maintenance and nursery services for over 160 employees who are responsible for maintaining parks facilities and services across the city.
![Image shows the greenhouse and other warehouse buildings located in the Mt. Tabor Maintenance Yard.](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2020-09/p30075_mt.-tabor-yard_before_dji_0014.jpg?itok=0oqbc5wd)
SE 150th and Division Street Park Master Plan
Parks
In Planning
The master plan for SE 150th and Division Street Park reflects a collaborative effort involving neighbors and community groups to create a welcoming space with activities for people of all ages.
![SE 150th & Division Street Park Design Drawing](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2020-05/dvision-150-master-plan-design.png?itok=X8h4-IHN)
Willamette River Crossing construction updates
Capital Improvement Project
In Planning
2016 through 2030
Timing has changed for implementation of the final phases of design and construction for the Willamette River Crossing project. This page will be updated when the new timeline is available.
![This graphic shows the path of the pipe underground. On the west side there will be open trench work and a microtunnel. We will use Direct Pipe to build the pipe under the river, then bore and jack under the railroad. We will install the pipe in a trench near the road surface between SE 3rd and SE 10th Avenues.](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2021/wrx-cutaway-oct-2021-r04.png?itok=-plpRTg-)
Beatrice Morrow
Rental
Open
Fall 2018
The 80-unit Beatrice Morrow apartments, completed by PCRI in the Eliot neighborhood, serves displaced or longtime residents of North/Northeast Portland under the City’s Preference Policy.
![photo](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2022/beatricemorrow-joshpartee-5098.jpg?itok=7LfPkKaK)
Washington Park Reservoir construction updates
Capital Improvement Project
Under Construction
2016 through 2025
Construction at the Washington Park Reservoir started in 2016 and will continue until 2025. Read on for the most recent update.
![Washington Park Reservoir construction crews working on the cascading water feature of the reflecting pool. Taken June 2024.](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2024/wa-park-cascading-water-feature-6.18.24_2.jpg?itok=129rOhAC)
Grant Park Projects
Parks
Active
Active
![Grant Park](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2020-04/grant-park.jpg?itok=5jYoB1dZ)
Blackburn Center
Rental
Open
Summer 2019
Central City Concern’s Blackburn Center combines 124 units of affordable housing with an on-site clinic and services for medical and mental health and recovery.
![exterior view of the building and MAX light rail](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2022/blackburn-exterior-scaled.jpg?itok=Hoo0aaLi)
Charlotte B. Rutherford Place
Rental
Open
Fall 2018
Charlotte B. Rutherford Place, developed by Central City Concern, provides 51 units of affordable housing in the Arbor Lodge neighborhood, with priority given to displaced or longtime residents of North/Northeast Portland through the City’s Preference Policy.
![photo of the building](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2021/cbrgo-057.jpg?itok=IjwCmHfy)
South Corbett and Carolina Sewer Repair Project
Sewer and Stormwater
Active
Construction is anticipated to start in the Summer of 2024 and will take up to four months to complete.
Environmental Services is designing a sewer project to replace 250 feet of aging pipes near private properties within the Corbett neighborhood. This project will protect public health and the environment by reducing the possibility of sewage releases to homes, businesses, and streets.
Project design began in 2019 and will continue through 2024. Construction is expected to begin in early March 2025 and will be completed by mid-February 2026.
Environmental Services is designing a project to restore about 18 acres in the Johnson Creek floodplain. The project will reconnect Johnson Creek to its historic floodplain, reduce flooding on private property, restore habitat for fish and wildlife, and improve water quality in the creek.
The Vera
Rental
Open
Fall 2019
Developed by BRIDGE Housing, the Vera brings 203 new affordable housing units to the South Waterfront.
![dramatic lighting of the Vera at dusk, as cars and light rail train pass by](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2021/verahome.jpg?itok=_hjjRdaF)
Orchards of 82nd
Rental
Open
Spring 2019
Rose CDC’s Orchards of 82nd, a 48-unit housing project and multicultural community space, addresses gentrification and displacement in Southeast Portland’s Jade District.
![photo of building front view](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2021/orchards_front-exterior.jpg?itok=UVPyJpBc)
St. Francis Park
Rental
Open
Spring 2017
Catholic Charities and Home Forward developed St. Francis Park to provide 105 affordable units in inner Southeast Portland.
![photo](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2022/francis-clare-commons-labyrinth-2048x1367.jpg?itok=VPJrqXID)
Oliver Station
Rental
Open
Summer 2018
Developed by Palindrome Communities, Oliver Station adds 125 units of affordable, transit-oriented housing to the Lents Town Center.
![photo, front view of building](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2021/oliver-station_0.png?itok=V9visHWg)
Oak Leaf Mobile Home Park
Rental
Open
Spring 2019
St. Vincent de Paul has purchased the Oak Leaf Mobile Home Park to preserve 22 affordable homes in Cully.
![street view](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2022/oak-leaf-google-maps-wideview_0.jpg?itok=z9H1uZ_V)
New Meadows
Rental
Open
Spring 2018
New Meadows offers 14 units of transitional housing in Portsmouth for young people who have aged out of foster care.
![exterior view](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2022/new-meadows-exterior_shot-2018.jpg?itok=Frxf4qgG)
Lents Commons
Rental
Open
Spring 2018
Lents Commons offers 16 affordable apartments along with market-rate housing and retail space in the Lents Town Center.
![photo](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2022/lents-commons-photo-from-bremik.jpg?itok=yIQWQnwP)
Hill Park
Rental
Open
Summer 2017
Central City Concern’s Hill Park Apartments in South Portland provides 39 affordable units with convenient access to transit and services.
![Street view of the building. Convenient bus access](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2022/hill-park-apartments-photo.jpg?itok=QwNpvc25)
Hazel Heights
Rental
Open
Winter 2018
Hazel Heights is Central City Concern’s 153-unit affordable housing development in Hazelwood.
![street view, building exterior](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2022/hazelheights_1-wideview.jpg?itok=-Ao8YKYe)
Hawthorne East Apartments
Rental
Open
Fall 2016
At Hawthorne East in inner Southeast Portland, Northwest Housing Alternatives has preserved 70 affordable homes for seniors and adults with special needs.
![tall trees provide privacy and greenery outside the apartment building](https://cdn.statically.io/img/www.portland.gov/sites/default/files/styles/featured_2_1_600w/public/2022/img_20170421_180126.jpg?itok=h5nUA1Tr)
Bạn thấy điều gì đó mà chúng tôi có thể cải thiện trên trang này? Cung cấp phản hồi cho trang web .