Infrastructure Consulting & Engineering’s Post

Witness the installation of the prefabricated straddle bent girder over CSX Railroad, captured this morning by our CEI Inspector, Robert Burns. Spanning over 3,320 feet, Bridge 35 is the signature bridge for Phase I of the Carolina Crossroads Project. Our dedicated SC Bridge Design Team at ICE developed an innovative design for the straddle bent cap, incorporating twin steel plate girders with an open bottom to ensure both structural integrity and future accessibility. #CarolinaCrossroads #BridgeDesign #BridgeConstruction https://lnkd.in/eAK7FFcJ

Same Day Smitty

Expedite it! With ShipSmith 🚀 Ground - Air

2mo

👏🏼

Like
Reply
Lynda DuTart Monroe

VP - Marketing at Infrastructure Consulting & Engineering, LLC (ICE)

2mo

This is awesome! Great job Robbie!!!

See more comments

To view or add a comment, sign in

Explore topics