E.S. Boulos Company’s Post

View organization page for E.S. Boulos Company, graphic

883 followers

We were proud to support campus development at the University of Southern Maine with the Portland Commons project, where #sustainability was a key feature of the project. Our team was responsible for the entire electrical scope of the work for the new, 580-bed, nine-floor dormitory which was engineered to use significantly less energy than traditional buildings. By prefabricating many of the parts needed on each floor, we achieved significant time savings! Prefabrication allowed the team to work ahead three months and save thousands of hours, designing each of the 17 types of units and organizing all the materials ahead of installation. While the dormitory work was going on, we also constructed all the necessary electrical infrastructure in the companion parking structure. This included the installation of 58 electric vehicle charging stations, which will further support the school’s sustainability efforts.   #ESBoulos #MYRGroup #electricalcontractors #prefab

  • A group of 12 male construction workers stand in a semi circle inside an unfinished room.
  • An exterior shot at dusk of a dormitory of University of Southern Maine.
  • An exterior shot at dusk of a dormitory at University of Southern Maine.
  • A hallway with yellow pillars and rooms along the right side of the hall.
  • A close up of an EV charging station in a parking garage
    +3

To view or add a comment, sign in

Explore topics