Doug Bors’ Post

View profile for Doug Bors, graphic

Developing design technology to bring prefabrication and build-off-site solutions to architects and developers in early design.

When I'm not loving sunrises and sunsets, I'm pretty much loving what I do -- bringing Leverage to CRE design teams. The potential to maximize value for off-site fabrication and flat-pack efficiency is too great, so I'm all in. FAQ: How much can Leverage help accelerate building delivery? Leverage accelerates project delivery two ways. First, by completing many of the procurement details in design that pave the way for manufacturing, we create an overlap in activities that normally follow one another. This overlap can save between two and four months from the overall project schedule. Second, by increasing off-site production and decreasing on-site labor, a project can meet more aggressive construction schedules, with time savings running between 15% and 50% of above-grade construction time. You can find our FAQ page here: https://lnkd.in/gJTcYe5X #cre #prefabrication #offsite #flatpack #designtechnology #bim

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics