close_game
close_game
Shashank Rao
Articles by Shashank Rao

Work begins in Thane on country’s first undersea rail tunnel for bullet train

Work on the tunnel is now inching towards the mouth of Thane Creek. A portion of it will pass below the creek, making it India’s first undersea rail tunnel

Thane, India - July 19, 2024: High speed railway (bullet train) tunnel from Ahmedabad to BKC Mumbai is in progress at Ghansoli parsik hill , in Thane,in Mumbai, India, on, Friday, July 19, 2024. ( Praful Gangurde /HT Photo )
Updated on Jul 22, 2024 09:15 AM IST

More AC locals, Kavach for Mumbai

Three days before the General Budget, Union Railway Minister Ashwini Vaishnaw held an eight-hour marathon meeting on Friday with Western and Central rail authorities at Churchgate, focusing on safety and development projects in Mumbai

HT Image
Updated on Jul 20, 2024 09:00 AM IST

BEST Bachao movement: Citizens to stand with QR code placards to save fleet

The members also spoke of the difficulties faced by students due to the shrinking fleet of buses across the city: “Students are forced to board crowded buses."

BEST Bachao movement: Citizens to stand with QR code placards to draw people’s attention to ailing fleet
Updated on Jul 19, 2024 10:01 AM IST

Work to add two lines on Mumbai's Western, Central lines moving at snail’s pace

Railways in Mumbai have been slow to complete the 5th and 6th lines to segregate suburban and long-distance trains, causing delays and cost escalation

Work to add two lines on WR, CR moving at snail’s pace
Updated on Jul 18, 2024 09:11 AM IST

BEST unions seek Mumbaikars’ help in reviving dwindling fleet

Their demand is to improve the BEST-owned bus fleet rather than being dependent on wet-lease buses; by March 2025, there will be only 761 owned buses

Mumbai, India - August 08, 2022: Visitors takes a look at the miniature BEST bus during the 75th anniversary of BEST Bus at Ravindra Natya Mandir, Prabhadevi, in Mumbai, India, on Monday, August 08, 2022. (Photo by Anshuman Poyrekar/ Hindustan Times) (Anshuman Poyrekar/HT PHOTO)
Updated on Jul 16, 2024 09:16 AM IST

Plan for 15-car trains on Churchgate-Andheri slow route scrapped

WR cancels plan for 15-car trains on Churchgate-Andheri slow route due to technical challenges. Platforms extension not feasible.

HT Image
Updated on Jul 16, 2024 07:50 AM IST

64 cr new platforms, 900 cr station remodelling, 26.80 cr multi modal cargo terminal

PM Modi dedicated new platforms at CSMT and LTT in Mumbai, with plans for further expansion to accommodate more long-distance trains.

HT Image
Updated on Jul 14, 2024 06:20 AM IST

After criticism, 92 general coaches added to 46 long-distance trains from Mumbai

The trains connecting Mumbai in which coaches have been added include Bandra-Bhuj Kutch Superfast Express and Bhavnagar-Bandra Terminus Superfast Express

Ludhiana, India – November 23, 2023: Passengers stranded at railway station Ludhiana after trains were delayed to farmers protest in Ludhiana on Thursday, November 23, 2023. (Photo by Manish/Hindustan Times)
Updated on Jul 13, 2024 09:09 AM IST

Autorickshaw unions demand fare hike after CNG price rise

Mumbai auto unions demand fare hike after CNG price increase by ₹1.50/kg; taxi unions to discuss. Rising expenses prompt call for base fare increase.

Thane, India - July 09, 2024: CNG gas has increased by 1.50 paise from Tuesday, Drivers are seen filling vehicles with CNG gas at Thane CNG pump , in Thane,in Mumbai, India, on, Tuesday, July 09, 2024. ( Praful Gangurde / HT Photo )
Updated on Jul 10, 2024 09:08 AM IST

Rainfall throws Mumbai train services out of gear, 900 trains cancelled on CR

CR officials said heavy rains of around 300mm from midnight to 6 am on the night of July 7/8 led to the cancellation of almost 900 services

Thane, India - July 08, 2024: Due to heavy rains in Thane district, local services have been affected and as local trains are running late, there is a rush of commuters at Thane station on Monday morning , in Thane,in Mumbai, India, on, Monday, July 08, 2024. ( Praful Gangurde / HT Photo )
Updated on Jul 09, 2024 09:03 AM IST

After several hitches, WR has a real-time monitoring app for escalators, lifts

The new app aims to significantly reduce the downtime of the escalators and lifts, thereby increasing their availability to passengers

Western Railway develops real-time monitoring app for escalators, lifts
Updated on Jul 08, 2024 09:15 AM IST

Mumbai Metro 3 inches closer to completion, receives 4,474 crore fund infusion

Trials for the corridor, designated as Metro-3, were completed recently by the Research, Design and Standards Organisation, which comes under Indian Railways

Workers at the underground station of Metro Line 3, below Mithi River at Bandra Kurla Complex Station. (Anshuman Poyrekar / HT Photo)
Updated on Jul 06, 2024 09:09 AM IST

Slow upgrades, state apathy: Mumbai’s first metro line struggles on many fronts

This week, two separate incidents of technical failure forced MMOPL to withdraw metro trains from service

On July 4, new escalators were installed by the Mumbai Rail Vikas Corporation (MRVC) to connect the railway and metro stations at Ghatkopar. MRVC
Updated on Jul 05, 2024 08:29 AM IST

Mumbai swelters but railways drags feet on new AC locals

Railway ministry delays supplying AC local trains to Mumbai despite high demand, with only 12 sought but none in production

The rail authorities have sought 12 new AC local trains but not even one is under manufacturing at the Integral Coach Factory in Chennai. (Photo by Anshuman Poyrekar/Hindustan Times) (Anshuman Poyrekar/HT Photo)
Updated on Jul 04, 2024 08:51 AM IST

WR installs heavier concrete sleepers to boost Rajdhani, Vande Bharat speeds

The work will enable the Rajdhani, Vande Bharat and Shatabdi trains to reach their potential and run at semi-high-speeds of 160 kmph

WR installs heavier concrete sleepers to boost train speeds
Updated on Jul 03, 2024 08:58 AM IST

Sion ROB closure to increase travel time for 200 BEST buses

Some of the routes would have to curtailed, while in some cases, the destination may be changed, said BEST officials

The 112-year-old Sion-Dharavi Bridge will be demolished soon to make way for the central railway`s gift and sixth railway line between Kurla and Dadar in order to segregate local train lines from long-distance ones, Mumbai, India. Jan 04, 2023. (Photo by Raju Shhinde/HT Photo)  
Updated on Jul 02, 2024 07:44 AM IST

Tourist bus operators protest over abysmal quality of new Ashok Leyland buses

Mumbai: Tourist bus operators protest over substandard new Ashok Leyland buses with defects causing breakdowns, safety concerns for passengers.

HT Image
Updated on Jun 30, 2024 07:30 AM IST

WR to monitor Mithi, Dahisar river levels during monsoons

Western Railway monitors river levels with pulse radar machine every 15 mins to prevent flooding. Central Railway waterproofs 231 flood-prone points to ensure smooth train operations.

To remotely monitor the continuous river level, WR has installed four pulse radar-based water level monitoring instruments with an Intelligent Field Device at vulnerable bridge.
Updated on Jun 29, 2024 08:08 AM IST

Metro 1 rife with irregularities, state gives up idea of taking over ops

The government is considering the option of making a one-time payment to clear bank loans and avoid corporate insolvency on the part of MMOPL

A Reliance Infrastructure spokesperson said the government’s latest decision would not impact Metro operations ) (HT PHOTO)
Updated on Jun 29, 2024 08:48 AM IST

Tout books 3,600 railway tickets worth over 6 crore, arrested

WR's vigilance department busted a ticketing racket in a 36-hour operation in Mumbai, where a tout misused IRCTC website to create fake demand for tickets worth over ₹6 crore.

HT Image
Updated on Jun 28, 2024 07:06 AM IST

Maharashtra sanctions 1,163 crore for Metro 3

Around 98% of work on the corridor has been completed and the first phase between Aarey and BKC is likely to be opened to the public this September

Mumbai, India - July 23, 2022 : A bird's eye view of Mumbai Metro-3 car shed at Aarey Colony, Goregaon, in Mumbai, India, on Saturday, July 23, 2022. (Photo by Vijay Bate/HT Photo) (HT PHOTO)
Updated on Jun 28, 2024 08:53 AM IST

Palghar train derailment blamed on loose steel coils: WR report

A 350-page investigation report has stated that the derailment of seven wagons of a goods train in Palghar was caused by loosened steel coils, each weighing between 20-22 tonnes, tied onto the wagons

Palghar train derailment blamed on loose steel coils: WR report
Updated on Jun 27, 2024 08:18 AM IST

With mounds of garbage, Jogeshwari Terminus is now a dumpyard

With construction work for a new terminus going on in Jogeswari for the past one year, the railway ground has now started resembling a dumpyard

Mumbai, India - June 25, 2024: Garbage on the railway track near Ram Mandir station in Mumbai, India, on Tuesday, June 25, 2024. (Photo by Satish Bate/ Hindustan Times) (Hindustan Times)
Updated on Jun 26, 2024 08:58 AM IST

Railways, IRCTC begin food inspection on long distance trains and stations

Indian Railways and IRCTC have started inspecting the quality and quantity of eatables and drinks served to passengers on the long-distance trains and at the food stalls in railway stations

HT Image
Updated on Jun 25, 2024 07:46 AM IST

BMC rebuffs BEST’s plea for 1,400 cr aid

Cash-strapped BEST seeking ₹1,400 crore aid from BMC. Talks of possible bus fare hike to generate revenue. BMC asks for revenue options, sparking discussions.

HT Image
Updated on Jun 24, 2024 06:38 AM IST

Passenger associations demand more trains, longer platforms between Thane and Kalyan

The passenger associations met with RK Yadav, the general manager of Central Railway, on June 19 to discuss various issues commuters face. Particularly in focus was the patch between Thane and Kalyan, where there have been several recent cases of commuters falling off crowded trains

Kalyan, India – July 4, 2019: Dombivali Commuters have complaint of leaking roofs during monsoon. the commuters claimed that the portion near the CSMT side women compartment of the train has no roof due to which they are drenched while boarding or alighting the train at platform no 5 dombivili station in kalyan, India, on Thursday, July 4, 2019. (Photo by Rishikesh Choudhary/ Hindustan Times (HT PHOTO)
Updated on Jun 21, 2024 07:50 AM IST

Sion ROB closed for heavy vehicles from Friday midnight

Central Railway proposes heavy vehicle restriction on Sion ROB from June 21-22 due to safety concerns. IIT Mumbai declares bridge unsafe, calls for urgent action.

HT Image
Updated on Jun 20, 2024 07:40 AM IST

Accident highlights Railways’ tardiness on Kavach installation

Indian Railways is talking about calling for bids for 10,000 km of route for Kavach. However, one of the foremost routes on the Mumbai-Surat-Ahmedabad-Delhi corridor, where work on installing Kavach is underway and was supposed to be completed this month, is going very slowly

HT Image
Updated on Jun 19, 2024 07:30 AM IST

Mumbai Metro barricades come down, 63% of city roads freed

According to MMRCL, 45 percent of the roads that were barricaded in the 1,165 metres of Package 2 of the metro project have been restored

Mumbai, India - June 13, 2024: View of D N Road, after barricade removed partially by MMRDA during metro working, in Mumbai, India, on Thursday, June 13, 2024. (Photo by Anshuman Poyrekar/ Hindustan Times) (Hindustan Times)
Updated on Jun 17, 2024 08:42 AM IST

Power outages plague older, congested parts of South Mumbai

In less than a week, the Brihanmumbai Electricity Supply and Transport (BEST) has received over 350 complaints of power cuts from its consumers

Aslam Malkani carrying bottled water as constant electricity failure has made accessing the water purifier very difficult. (Anshuman Poyrekar/ Hindustan Times)
Updated on Jun 15, 2024 08:49 AM IST
SHARE
  • 1
  • 2
  • 3
  • ...
Story Saved
Live Score
Saved Articles
Following
My Reads
Sign out
New Delhi 0C
Tuesday, July 23, 2024
Start 14 Days Free Trial Subscribe Now
Follow Us On