Overview
About the Project
The project will allow for the supply and export of renewable generation on Yell and mainland Shetland, by developing and constructing transmission connections to the Kergord Switching Station and HVDC Converter Station, which will then export via the proposed Shetland HVDC Link and on to the UK mainland. To enable these connections, the following project elements are required:
- A new 132kV Switching Station located on Yell to connect Energy Isles and Beaw Field Windfarms
- A new 132kV underground cable and overhead line to connect the Energy Isles and Beaw Field Wind Farms to the Yell Switching Station
- A new 132kV connection from Yell Switching Station to Kergord 132kV Substation and HVDC Converter Station. This will consist of a 132kV underground cable, overhead line and a subsea cable between Yell and mainland Shetland
- A new 132kV underground cable and overhead line to connect Mossy Hill Wind Farm to Kergord Substation
- A new 132/33kV Grid Supply Point (GSP) at Gremista with a 22km double circuit 132kV connection, which will be a combination of both underground cable and overhead line, between Gremista GSP and Kergord substation.
These works are required to connect the contracted wind generation on Shetland to the Scottish Mainland via the Shetland HVDC Connection Project.
Find out more about Shetland HVDC Link
Why is the Project Required?
As the transmission licence holder in the north of Scotland, we have a duty under Section 9 of the Electricity Act 1989 to facilitate competition in the generation and supply of electricity. We have obligations to offer non-discriminatory terms for connection to the transmission system, both for new generation and for new sources of electricity demand.
The aim of the project is to enable renewable energy to connect to our transmission network. Under our Network Operators Licence this connection should be efficient, co-ordinated and economic, whilst having the least possible impact on the environment.
Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a project and we want to understand what local people think about our plans.
We endeavour to take the time to discuss our proposals with local community councils and the wider affected community and to carry out engagement at key stages, listening to feedback before finalising project plans.
How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.
Project Updates
Project updates
Documents
-
Shetland Future Energy Ambitions Webinar 7th July 2023
- Type:
- Date:
- 21 September 2023
- Size:
- 3 MB
-
Latest Shetland Newsletter
- Type:
- Date:
- 15 September 2023
- Size:
- 6 MB
-
May 2023 Yell SS Information Event - Banners
- Type:
- Date:
- 17 May 2023
- Size:
- 13.7 MB
-
May 2023 Yell SS Information Event - Booklet
- Type:
- Date:
- 17 May 2023
- Size:
- 2.6 MB
-
July 2020 - Information Brochure
- Type:
- Date:
- 18 September 2022
- Size:
- 18.8 MB
-
July 2020 Consultation - Mossy Hill Map
- Type:
- Date:
- 18 September 2022
- Size:
- 7 MB
-
July 2020 Consultation - North Mainland & Yell Map
- Type:
- Date:
- 18 September 2022
- Size:
- 3.2 MB
-
July 2020 Consultation - Overall Project Map
- Type:
- Date:
- 18 September 2022
- Size:
- 4.3 MB
-
July 2020 Consultation - Subsea Search Area
- Type:
- Date:
- 18 September 2022
- Size:
- 1.8 MB
-
July 2020 Consultation - Yell Map
- Type:
- Date:
- 18 September 2022
- Size:
- 3.8 MB
-
June 2021 Consultation - Banners
- Type:
- Date:
- 18 September 2022
- Size:
- 2.3 MB
-
June 2021 Consultation - Preferred Route Selections
- Type:
- Date:
- 18 September 2022
- Size:
- 1.6 MB
-
June 2021 Consultation Booklet
- Type:
- Date:
- 18 September 2022
- Size:
- 2.5 MB
-
September 2021 - Information Brochure
- Type:
- Date:
- 18 September 2022
- Size:
- 14.8 MB
Gallery
Gremista GSP
Gremista GSP
Gremista GSP
Gremista GSP
FAQs
FAQs
Recite me
To make use of this function please click on the 3 'A's' button at the bottom left of the website.