A lot of #engineering is behind this project to ensure that the functional performance is met within the confinements of the platform area. Great work done by our engineering and supply chain teams. Brian Germaine Valentino Dorigo
Aker Solutions has chosen us to provide two new water injection packages for the Draugen #offshore platform power from shore project. The pump packages are part of an electrification program that is expected to save up to 200,000 tonnes of #CO2 per year, contributing to the decarbonisation of offshore oil & gas operations in the North Sea. The contract will be fulfilled by our #ClydeUnionPumps brand, with the skidded packages being assembled at their flagship site in Glasgow. ℹ️ https://lnkd.in/egzUuY_K #decarbonisation #energy #pumps #CelerosFT
Engineering Director Pumps & GD Closure Systems MBA
1wThank you Teleb.