Barnhart Crane & Rigging’s Post

View organization page for Barnhart Crane & Rigging, graphic

35,411 followers

Barnhart unloads two 397,000-pound autoclaves from a ship in Memphis with two 500-ton cranes onto two 12-Line PST Goldhofer trailers for transport. The autoclaves were hauled approximately two miles to a manufacturing site. The 31’ tall convoy required moving numerous electrical and communication lines along the route. Most of the electrical lines had to be de-energized and dropped. Two sets of electrical transmission lines also had to be de-energized and grounded due to the load’s height. #barnhart #barnhartcrane #mindsovermatter #craneandrigging #

To view or add a comment, sign in

Explore topics