RIB U.S. Cost is seeking Scheduler for heavy construction projects to join our Dallas Fort-Worth team. RIB is a leader in providing project controls related services across all verticals within the construction and EPC/M industry.
JOB DESCRIPTION
Perform scheduling and/or other controls functions for the management of large, complex, multipackage airport construction projects.
Develop and maintain program and project schedules including resource/cost loading, allocation, utilization, and management in Primavera P6 as part of a project controls team.
Coordinate and gather project status information from project managers to determine program management and operation team requirements.
Must be able to develop detailed human resource-oriented schedules.
KNOWLEDGE, SKILLS AND ABILITIES REQUIRED
Minimum 5 years of scheduling/project controls experience on aviation, transportation or building construction projects.
Highly skilled in Primavera P6
Bachelor's degree in engineering, architecture, construction management or other relevant fields is required.
Industry certifications (PSP, PMI-SP, etc)
Experience with analytical tools (e.g., Schedule Analyzer Pro, Acumen) are preferred.
Exhibit a high degree of professionalism in the production of deliverables and in interactions with fellow employees and client personnel.
Must be able to show proof of eligibility to work in the USA.
This is a full-time salaried position with a competitive benefits package. This position requires presence in the office five days per week. This is not a remote position. Salary will be commensurate with overall experience level.
RIB U.S. COST, a subsidiary of RIB Software GmbH, provides exceptional professional services to owners, architects, engineers and contractors. We've been in business nearly 40 years, delivering cost and schedule expertise. Our clients know they can trust us to deliver the best service in our areas of specialty.
We offer a competitive benefits package to full-time employees, including the opportunity to participate in an Employee Stock Ownership Program for, Schneider Electric, a Fortune 500 Global company.
RIB U.S. COST is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sexual orientation, gender identity, national origin, genetics, disability, age, veteran status, or any other characteristic protected by law.
Seniority level
Mid-Senior level
Employment type
Full-time
Job function
Consulting, Project Management, and Analyst
Industries
Construction, Architecture and Planning, and Engineering Services
Referrals increase your chances of interviewing at RIB U.S.COST by 2x