John Clinnin

Downers Grove, Illinois, United States Contact Info
2K followers 500+ connections

Join to view profile

About

Over 28 years of experience in construction management and resident engineering services…

Articles by John

Activity

Join now to see all activity

Experience & Education

  • Wight & Company

View John’s full experience

See their title, tenure and more.

or

By clicking Continue to join or sign in, you agree to LinkedIn’s User Agreement, Privacy Policy, and Cookie Policy.

Licenses & Certifications

Projects

  • IL 56 (Butterfield Road) west of IL Rte 59 to east of Winfield Road

    - Present

    3.125 miles of roadway widening and reconstruction with full depth hot-mix asphalt pavement. The project includes a bridge over the West Branch of the DuPage River, a dual cell box culvert at Ferry Creek, and a noise abatement wall.

    Other creators
    See project
  • Edens Spur (I-94) Roadway and Bridge Rehabilitation

    -

    Repairing and resurfacing five miles of mainline pavement, rehabilitating seven bridge structures, and installing ITS systems in both directions between the Tri-State Tollway (I-94) and the Edens Expressway (I-94).

    Other creators
    See project
  • FAI 55 @ IL Route 59

    -

    Widening and reconstruction of IL59 from I-55 to DuPage River Bridge, relocation and reconstruction of I-55/ IL59 interchange ramps (NB IL59 Exit Ramp and SB IL59 Entrance Ramp) to the south ½ mile, construction of a new NB IL59 exit ramp flyover bridge, demolition of the existing NB IL59 exit ramp flyover bridge, construction of auxiliary lanes along I-55 between the IL59 interchange and I-80 interchange, I-55 shoulder widening, and I-55 interchange lighting.

    Other creators
    See project
  • The Reagan Memorial Tollway (I-88) Rebuild and Widen Project

    -

    Corridor Construction Manager for multiple Rebuild & Widen Projects along a 23-mile stretch of the Reagan Memorial Tollway (I-88) from Oak Brook to Aurora.

    Other creators
    • Fred Page, Dan Griffin
    See project
  • I-355 South Extension – I-55/I-355 Interchange

    -

    I-55/ I-355 Interchange Contract I-05-7711. Project includes construction of five major bridges including three mainline structures and three curved steel girder flyover structures, roadway, ramps, lighting, drainage, earthwork, retaining wall and noise walls.

    Other creators
    • http://www.illinoistollway.com/construction-and-planning/completed-projects
    See project
  • I-355 South Extension – South Mass Grading and Drainage

    Clearing, grading, & drainage contract for the North –South Tollway - South Extension, sections 702 to 706. This 9.7 mile long project included clearing over 775 acres, over four million cubic yards of earthwork, erosion control, storm sewer installation, and construction of temporary waterway crossings.

    Other creators
    See project

More activity by John

View John’s full profile

  • See who you know in common
  • Get introduced
  • Contact John directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Others named John Clinnin

Add new skills with these courses