Eric Dues, P.E., S.E.

Columbus, Ohio, United States Contact Info
814 followers 500+ connections

Join to view profile

About

Eric is a structural engineer and Columbus Bridge Department Manager at Gannett Fleming…

Activity

Join now to see all activity

Experience & Education

  • Gannett Fleming

View Eric’s full experience

See their title, tenure and more.

or

By clicking Continue to join or sign in, you agree to LinkedIn’s User Agreement, Privacy Policy, and Cookie Policy.

Volunteer Experience

  • Mentor

    Engineers Without Borders

    - Present 11 years 7 months

    Health

    Water system construction in Baffousam, Cameroon

Publications

  • Fracture Critical Analyses of Pony-Truss Bridges

    ODOT Research Initiative for Locals

    The study outlined in this report aimed to quantify the available redundancy in pony truss bridge systems
    constructed using standard designs and practices in the state of Ohio. A method of conducting refined
    three-dimensional nonlinear finite element analyses that can be used to assess the level of redundancy
    in bridge pony systems was developed and used to study the performance of pony truss bridges. It was
    found that when they are properly detailed and constructed, deck systems in…

    The study outlined in this report aimed to quantify the available redundancy in pony truss bridge systems
    constructed using standard designs and practices in the state of Ohio. A method of conducting refined
    three-dimensional nonlinear finite element analyses that can be used to assess the level of redundancy
    in bridge pony systems was developed and used to study the performance of pony truss bridges. It was
    found that when they are properly detailed and constructed, deck systems in pony-truss bridge can be
    inherently redundant. To a lesser extent, it was also found that truss members in properly designed and
    constructed bridges can also be redundant.

    See publication
  • Great Bridges in Great Britain

    Pittsburgh Engineer, Summer 2011 (Special International Bridge Conference Edition)

    A history of landmarks in form and design.

    See publication

Projects

  • City of Phoenix Bridge Inspection

    - Present

    Team leader for inspection work for City of Phoenix. Work included detailed field inspection of bridges and culverts owned by the City, as well as load rating of bridges and miscellaneous design work on these structures. The bridges included cast-in-place concrete slab, pretensioned I-girders and box beams and post-tensioned box girders and steel I-girders, box girders and trusses (mostly for pedestrian bridges). Locations comprised dry washes, rivers, canals, railroad and light rail crossings,…

    Team leader for inspection work for City of Phoenix. Work included detailed field inspection of bridges and culverts owned by the City, as well as load rating of bridges and miscellaneous design work on these structures. The bridges included cast-in-place concrete slab, pretensioned I-girders and box beams and post-tensioned box girders and steel I-girders, box girders and trusses (mostly for pedestrian bridges). Locations comprised dry washes, rivers, canals, railroad and light rail crossings, airport roads and taxiways, and some grade separated interchanges. In addition to field inspection, work included coordinating several different inspection teams and working with multiple agencies such as Valley Metro (light rail structures), Salt River Project (canals), ADOT and Phoenix Dept of Aviation (airport structures) as well sub-contractors for traffic control and access equipment.

    Other creators
  • Well System Design and Implementation (Phase II)

    - Present

    Through Engineers Without Borders at Central Ohio Professionals I assisted with the structural design of a GRS water tank platform and a timber solar mounting structure for the small village of Batoula, Cameroon. Implementation is scheduled for January 2012.

    Other creators
    See project
  • Anthony Wayne Suspension Bridge (LUC-2-18.62)

    - Present

    Inspection and Design of the suspension bridge floor system, tower joint, and deck design that incorporates cathodic protection anodes and supplementary reinforcing that makes the deck composite with the stiffening girders.

    Inspection in 2004. Rehab in 2008-2010 (including construction services). In-Depth inspection in 2020.

    See project
  • Lazelle Road Widening and Railroad Bridge Replacement

    -

    Roadway widening and replacement of CSX and NSRR railroad bridges through phased construction and unique shoring sequencing.

    See project
  • DART Blue Line Expansion

    -

    Technical design lead on 7 structures for the nearly five-mile DART Rail Blue Line extension to Rowlett scheduled to open in December 2012.

    See project

Honors & Awards

  • ENR Midwest Top Young Professionals

    Engineering News-Record (ENR)

    http://gannettfleming.com/NewsRoom/NewsAndEvents/enr-midwest-names-dues-to-top-young-professionals-list

    http://www.enr.com/articles/41320-enr-midwests-2017-top-young-professionals-make-big-impact-on-industry

Organizations

  • ABCD Central Ohio

    President & Founding Officer

    - Present

    Autonomous regional organization for the betterment of the bridge construction and design. https://www.abcdcoh.org/

  • AREMA Committee 15

    Member

    - Present

    Steel Structures Committee

  • AREMA

    Full Member

    - Present
  • Engineers Without Borders

    Member/Mentor

    - Present
  • ASCE

    -

Recommendations received

More activity by Eric

View Eric’s full profile

  • See who you know in common
  • Get introduced
  • Contact Eric directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Add new skills with these courses