Happy National Intern Day! 🎉 A huge thank you to our amazing interns at MGC Contractors! Your hard work and enthusiasm make a big difference in our efforts to build and maintain essential water and wastewater infrastructure. We truly appreciate your fresh ideas and dedication. You're a vital part of our team! #NationalInternDay #MGCContractors #WaterWastewater
MGC Contractors, Inc.
Construction
Phoenix, Arizona 1,533 followers
We are an employee-owned general contractor specialized in water and wastewater production construction.
About us
MGC Contractors, Inc. is an Arizona Corporation having operated within Phoenix, AZ continuously since 1982. MGC Contractors, Inc. was preceded by MGC Contracting, Ltd., which began business in the Valley in 1974 and for nearly 50 years, our company has been a water industry leader. We specialize in all forms of water and wastewater general contracting including Job Order Contracting, Construction Manager at Risk, Design-Bid-Build, and Design-Build throughout Arizona, Texas, Utah, and New Mexico.
- Website
-
http://www.mgccontractors.com
External link for MGC Contractors, Inc.
- Industry
- Construction
- Company size
- 201-500 employees
- Headquarters
- Phoenix, Arizona
- Type
- Privately Held
- Founded
- 1974
- Specialties
- Well Drilling & Equipping, Water Treatment, Groundwater Treatment, Water Reservoirs, Booster Pump Stations, Lift Stations, Piplines, Wastewater Treatment, Odor Control, Water Reuse, Valve Maintenance, and Disinfection
Locations
-
Primary
4110 East Elwood Street
Phoenix, Arizona 85040, US
-
223 Lucinda Dr
New Braunfels, Texas 78130, US
-
2975 West Executive Pkwy Suite 120
Lehi, Utah 84043, US
Employees at MGC Contractors, Inc.
Updates
-
Below are some photos of the work being done on our Scottsdale BPS 83AB Rehab project. Currently, we are finishing up the installation of the security system conduits. The crew will soon be backfilling to prepare the area for lifting and setting our 1250KW generator on the concrete slab. The standby generator will keep the booster pump station functioning and the service areas supplied with water in the event of a power loss emergency. #MGCContractors #RehabilitationProject #BoosterPumpStation
-
-
We are happy to announce the successful completion of our Back to School Drive for the City of Buckeye! This initiative has been a fantastic opportunity for MGC Contractors to give back to our community and support students in need as they prepare for the upcoming school year. A heartfelt thank you to all our Employee Owners who generously donated supplies and their time to make this drive a success. #CommunitySupport #BackToSchoolDrive #MGCContractors
-
-
As we gear up for Independence Day, MGC Contractors wishes everyone a safe and joyous holiday weekend! #IndependenceDay #StaySafe #MGCContractors
-
-
Last week, the City of Buckeye’s Water Resources and Development Services staff visited the impressive 2.8MG tank at the Farallon Water Campus. This project is not only significant for our team at MGC, but also stands as one of the largest active capital projects for the City of Buckeye. Key Highlights: - Tank Floor: 431 cubic yards of concrete - Tank Roof: 712 cubic yards (estimated) of concrete to be poured in late July; at 13” thick, the roof will weigh approximately 2.7 million pounds - Support Structure: Thirty-two 18” columns will support the roof We are thrilled to see this project progress every week and make a positive impact on the City of Buckeye’s infrastructure! 💧#InfrastructureDevelopment #CityProjects #WaterResources
-
-
🐾 Over the weekend, a group from MGC volunteered at the Humane Society for a Doggie-Day-Spa! Our goal was to pamper and play with some wonderful pups who are looking for their forever homes. It was a heartwarming experience and a reminder of the joy that comes from giving back. 🐶 #CommunityService #HumaneSociety #MGCCares
-
-
MGC’s Austin Team attended an event this past Friday to support Texas Parks and Wildlife Enforcement Officers, for an Organization called OGT (Operation Game Thief). Working in the water and wastewater industry comes with a responsibility to the environment, including the protection of our local wildlife. Our Team was proud to support this Organization, and we had a ‘blast’ doing so at the Sportsman’s Finest at Hog Heaven. #Parks #Wildlife #EnvironmentalResponsibility #MGCContractors
-
-
Last week, MGC held our 2024 Project Management Forum for the Arizona office. The day started with a team-building activity before settling in to review the past, present, and future of MGC. #CompanyCulture #MGCContractors #TeamBuilding
-
-
The crew at Farallon Water Campus has been hard at work pouring concrete columns for the tank. MGC is proud to be experienced in pre-stressed concrete reservoirs, having completed 30+ tanks previously. #MGCContractors #WaterCampus #PrestressedTank
-
-
Progress is being made on our Provo River WTP project! Malcolm Drilling has successfully installed a Beam and Lag shoring system. Starting with I Beams driven 30-34’ into the ground. We've then excavated the site in lifts down to an 18’ depth. Wooden beams were added in each lift until reaching the final excavation platform. Now, we're moving on to the next step: ground improvements with 2100 stone columns to be installed throughout the site. Stay tuned for more updates! #Construction #Shoring #GroundImprovement #WeBuildUtah #MGCContractors #MalcolmDrilling
-