A beautiful set completion in a gorgeous location. In just four days, this Extended Stay appeared from top to bottom in Alpine, Wy, near Jackson Hole. The project—led by GCHB Venture—brings 62 amenity-rich rooms to workers and visitors. Fun fact: as modules were transported, roof pieces were constructed on the site podium then placed on top with the same crane. And look at that tidy, waste-free site. A great example of modular speed and efficiency. Prefab Logic Accuset Construction Inc. The Bank of Commerce Westervelt Transport and Setup INC.
-
-
-
-
-
+2