The One (1 Bloor West) "time-lapse"
From October, 2020, as above-ground construction started in earnest at The One (1 Bloor W.) in Toronto. More or less a weekly photo usually taken on a Friday, with some gaps during early-on construction hiatuses. The initial photographs are from 2015, during demolition at the site, 2018, during caisson drilling, and early 2020 before above-ground construction began. At the end of the album is a weekly sequence starting July 2023 from Cumberland east of Bay: a near-diagonal view that shows the floors above level 16 or so.
246 photos · 3,843 views
1 3