Abstract
Brazil plans to build 43 “large” dams (>30 MW) in the Tapajós Basin, ten of which are priorities for completion by 2022. Impacts include flooding indigenous lands and conservation units. The Tapajós River and two tributaries (the Juruena and Teles Pires Rivers) are also the focus of plans for waterways to transport soybeans from Mato Grosso to ports on the Amazon River. Dams would allow barges to pass rapids and waterfalls. The waterway plans require dams in a continuous chain, including the Chacorão Dam that would flood 18 700 ha of the Munduruku Indigenous Land. Protections in Brazil’s constitution and legislation and in international conventions are easily neutralized through application of “security suspensions,” as has already occurred during licensing of several dams currently under construction in the Tapajós Basin. Few are aware of “security suspensions,” resulting in little impetus to change these laws.
Similar content being viewed by others
References
Abril, G., F. Guérin, S. Richard, R. Delmas, C. Galy-Lacaux, P. Gosse, A. Tremblay, L. Varfalvy, M.A. dos Santos, and B. Matvienko. 2005. Carbon dioxide and methane emissions and the carbon budget of a 10-years old tropical reservoir (Petit-Saut, French Guiana). Global Biogeochemical Cycles 19: GB 4007. doi:10.1029/2005GB002457.
Amigos da Terra-Amazônia Brasileira. 2014. Funai admite pressão e condiciona demarcação à hidrelétrica [FUNAI admits to be pressured and makes demarcation conditional on the hydroelectric dam (in Portuguese)]. Notícias. Retrieved 26 November 2014, from http://amazonia.org.br/2014/11/funai-admite-press%C3%A3oe-condiciona-demarca%C3%A7%C3%A3o-%C3%A0-hidrel%C3%A9trica/.
Aranha, A., and J. Mota. 2014. Mundukurus lutam por sua terra e contra hidrelétrica Tapajós. Pública, Agência de Reportagem e Jornalismo Investigativo. Retrieved, from http://jornalggn.com.br/blog/mpaiva/mundukurus-lutam-por-sua-terra-e-contra-hidreletrica-tapajos.
Aranha, A. 2015. “A Funai está sendo desvalorizada e sua autonomia totalmente desconsiderada”, diz ex-presidente [“FUNAI is being devalued and its autonomy totally ignored” says the ex-president (in Portuguese)]. Publica Agência de Reportagem e Jornalismo Investigativo. Retrieved January 27, 2015, from http://apublica.org/2015/01/a-funai-esta-sendo-desvalorizada-e-sua-autonomia-totalmente-desconsiderada-diz-ex-presidente/.
Arima, E.Y., P. Richards, R. Walker, and M.M. Caldas. 2011. Statistical confirmation of indirect land use change in the Brazilian Amazon. Environmental Research Letters 6: 024010. doi:10.1088/1748-9326/6/2/024010.
Barthem, R.B., M.C.B.L. Ribeiro, and M. Petrere. 1991. Life strategies of some long-distance migratory catfish in relation to hydroelectric dams in the Amazon Basin. Biological Conservation 55: 339–345.
Brazil, ANEEL (Agência Nacional de Energia Elétrica). 2011. Processo nº 48500.001701/2006-11. Assunto: Análise dos Estudos de Inventário Hidrelétrico da bacia do rio Juruena, localizado na subbacia 17, nos Estados de Mato Grosso e Amazonas [Case No. 48500.001701/2006-11. Subject: Analysis of the hydroelectric inventory studies of the Juruena River Basin (in Portuguese)] Nota Técnica no, 297/2011—SGH/ANEEL, de 05/-8/2011. Brasília, DF: ANEEL.
Brazil, MME (Ministério das Minas e Energia). 2013. Plano Decenal de Expansão de Energia 2022 [Ten-Year Energy Expansion Plan 2022 (in Portuguese)]. Brasília, DF: MME, Empresa de Pesquisa Energética (EPE). Retrieved, from http://www.epe.gov.br/PDEE/20140124_1.pdf.
Brazil, MT (Ministério dos Transportes). 2010. Diretrizes da Política Nacional de Transporte Hidroviário. [Guidelines of the National Waterway Transport Policy (in Portuguese)] Brasília, DF, Brazil: MT, Secretaria de Política Nacional de Transportes. Retrieved, from http://www2.transportes.gov.br/Modal/Hidroviario/PNHidroviario.pdf.
Brazil, PR (Presidência da República). 2000. Lei nº 9.985, de 18 de julho de 2000 [Law No. 9985 of July 18, 2000 (in Portuguese)]. Retrieved, from http://www.planalto.gov.br/ccivil_03/leis/l9985.htm.
Brazil, PR (Presidência da República). 2011. PAC-2 Relatórios [Reports (in Portuguese)]. PR, Brasília, DF. Retrieved, from http://www.brasil.gov.br.
Cernea, M.M. 1988. Involuntary resettlement in development projects: policy guidelines in World Bank-Financed Projects (World Bank Technical Paper No. 80), 88 pp. Washington, DC: The World Bank. Retrieved, from http://rru.worldbank.org/documents/toolkits/highways/pdf/91.pdf.
Cernea, M.M. 2000. Impoverishment risks, safeguards, and reconstruction: A model for population displacement and resettlement. In Risks and reconstruction. Experiences of resettlers and refugees, ed. M. Cernea, and C. McDowell, 504 pp. Washington, DC: The World Bank.
CIMI (Comissão Indigenista Missionária). 2014. Enquanto Funai admite orientação para paralisar demarcações, relatório demonstra efeitos da política governista [While Funai admits being told to paralyze demarcations, report shows effects of government policy (in Portuguese)]. Amazônia, July 19, 2014. Retrieved July 20, 2014 (15:36:27), from http://amazonia.org.br/2014/07/enquanto-funai-admite-orientacao-para-paralisar-demarcacoes-relatorio-demonstra-efeitos-da-politica-governista/.
CNEC Worley Parsons Engenharia, S.A. 2014a. Estudo de Viabilidade do AHE São Luiz do Tapajós. [Viability study of the São Luiz do Tapajós hydroelectric dam (in Portuguese)] São Paulo, SP: CNEC (Consórcio Nacional dos Engenheiros Consultores), 11 Vols. + attachments.
CNEC Worley Parsons Engenharia, S.A. 2014b. EIA: AHE São Luiz do Tapajós; Estudo de Impacto Ambiental, Aproveitamento Hidrelétrico São Luiz do Tapajós. [EIA: São Luiz do Tapajós Dam. Environmental impact study: São Luiz do Tapajós hydroelectric dam (in Portuguese)] São Paulo, SP: CNEC (Consórcio Nacional dos Engenheiros Consultores). 25 Vols. + attachments. Retrieved, from http://licenciamento.ibama.gov.br/Hidreletricas/São%20Luiz%20do%20Tapajos/EIA_RIMA/.
da Silva Neto, L.B. 2011. Ação Civil Pública 7786.39.2010.4.01.3603. 06 de dezembro de 2011 [Public Civil Suit 7786.39.2010.4.01.3603. December 6, 2011 (in Portuguese)] Sinop, MT: Juízo Federal da Vara Única de Sinop–MT.
de Almeida, J. 2010. Alta Tensão na Floresta: Os Enawene e o Complexo Hidrelétrico Juruena [High voltage in the forest: The Enawene and the Juruena hydroelectric complex (in Portuguese)] Monograph, Cuiabá, MT: Curso de Especialização (Lato Sensu) em Indigenismo, Universidade Positivo, Operação Amazônia Nativa (OPAN). Retrieved, from http://amazonianativa.org.br/download.php?name=arqs/biblioteca/13_a.pdf&nome=Juliana%20de%20Almeida_Alta%20Tens%E3o%20na%20Floresta%20Os%20Enawene%20Nawe%20e%20o%20Complexo%20Hidrel%E9trico%20Juruena.pdf.
Fanzeres, A. 2013. Povos indígenas da bacia do rio Juruena são preteridos de consulta prévia à emissão de licença em mais uma usina no rio do Sangue [Indigenous peoples of the Juruena River Basin are omitted from the prior consultation for licensing in yet another dam on the Sangue River (in Portuguese)]. Revista Sina. Retrieved June 18, 2013, from http://www.revistasina.com.br/portal/questao-indigena/item/9637-povos-ind%C3%ADgenas-da-bacia-do-rio-juruena-s%C3%A3o-preteridos-de-consulta-pr%C3%A9via-%C3%A0-emiss%C3%A3o-de-licen%C3%A7a-em-mais-uma-usina-no-rio-do-sangue.
Fearnside, P.M. 1999. Social impacts of Brazil’s Tucuruí Dam. Environmental Management 24: 483–495. doi:10.1007/s002679900248.
Fearnside, P.M. 2001. Soybean cultivation as a threat to the environment in Brazil. Environmental Conservation 28: 23–38. doi:10.1017/S0376892901000030.
Fearnside, P.M. 2002. Avança Brasil: Environmental and social consequences of Brazil’s planned infrastructure in Amazonia. Environmental Management 30: 748–763. doi:10.1007/s00267-002-2788-2.
Fearnside, P.M. 2006. Dams in the Amazon: Belo Monte and Brazil’s Hydroelectric Development of the Xingu River Basin. Environmental Management 38: 16–27. doi:10.1007/s00267-005-00113-6.
Fearnside, P.M. 2012. Belo Monte Dam: A spearhead for Brazil’s dam building attack on Amazonia? GWF Discussion Paper 1210, 6 pp. Canberra: Global Water Forum. Retrieved, from http://www.globalwaterforum.org/wp-content/uploads/2012/04/Belo-Monte-Dam-A-spearhead-for-Brazils-dam-building-attack-on-Amazonia_-GWF-1210.pdf.
Fearnside, P.M. 2013. Carbon credit for hydroelectric dams as a source of greenhouse-gas emissions: The example of Brazil’s Teles Pires Dam. Mitigation and Adaptation Strategies for Global Change 18: 691–699. doi:10.1007/s11027-012-9382-6.
Fearnside, P.M. 2014a. Análisis de los Principales Proyectos Hidro-Energéticos en la Región Amazónica [Analysis of the principal hydro-energetic projects in the Amazon region (in Spanish)], 55 pp. Lima: Derecho, Ambiente y Recursos Naturales (DAR), Centro Latinoamericano de Ecología Social (CLAES), and Panel Internacional de Ambiente y Energia en la Amazonia. Retrieved, from http://www.dar.org.pe/archivos/publicacion/147_Proyecto_hidro-energeticos.pdf.
Fearnside, P.M. 2014b. Impacts of Brazil’s Madeira River dams: Unlearned lessons for hydroelectric development in Amazonia. Environmental Science & Policy 38: 164–172. doi:10.1016/j.envsci.2013.11.004.
Fearnside, P.M. 2014c. Brazil’s Madeira River dams: A setback for environmental policy in Amazonian development. Water Alternatives 7: 156–169.
Fearnside, P.M., and R.I. Barbosa. 1996. Political benefits as barriers to assessment of environmental costs in Brazil’s Amazonian development planning: The example of the Jatapu Dam in Roraima. Environmental Management 20: 615–630. doi:10.1007/BF01204135.
Fearnside, P.M., and S. Pueyo. 2012. Underestimating greenhouse-gas emissions from tropical dams. Nature Climate Change 2: 382–384. doi:10.1038/nclimate1540.
Finer, M., and C.N. Jenkins. 2012. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity. PLoS One 7: e35126 doi:10.1371/journal.pone.0035126. Retrieved, from http://www.plosone.org.
Fiocruz (Fundação Oswaldo Cruz), and Fase (Federação dos Órgãos para Assistência Social e Educacional). 2013. Mapa de conflitos envolvendo injustiça, ambiente e saúde no Brasil [Map of conflicts involving environment, health and injustice in Brazil (in Portuguese)]. Rio de Janeiro, RJ: Fiocruz. Retrieved, from http://www.conflitoambiental.icict.fiocruz.br/index.php?pag=ficha&cod=426.
Freitas, T. 2014. Exportação de grãos vai dobrar, diz Bunge; para empresa, China manterá demanda [Exporting soy will double, says Bunge; the company believes China will maintain demand (in Portuguese)]. Folha de São Paulo, April 26, 2014, p. B-2.
Garcia, R. 2014. Impacto do clima será mais amplo, porém mais incerto [Impact of climate will be broader but more uncertain (in Portuguese)]. Folha de São Paulo, March 31, 2014, p. C-5.
Grupo de Trabalho Tapajós, and Ecology Brasil (Ecology and Environment do Brasil). 2014. Sumário Executivo: Avaliação Ambiental Integrada da Bacia do Tapajós. [Executive summary: Integrated environmental evaluation of the Tapajós Basin (in Portuguese)] 2580-00-AAI-RL-0001-01. Abril 2014. Rio de Janeiro, RJ: Ecology Brasil. Retrieved, from http://www.grupodeestudostapajos.com.br/site/wp-content/uploads/2014/04/Sumario_AAI.pdf.
IHU (Instituto Humanitas Unisinos). 2012. Movimentos sociais repudiam Medida Provisória que diminui áreas protegidas na Amazônia [Social movements repudiate provisional measure that reduces protected areas in Amazonia (in Portuguese)] IHU Notícias. Retrieved May 31, 2012, from http://www.ihu.unisinos.br/noticias/510033-movimentos-sociais-e-organizacoes-da-sociedade-civil-lancam-carta-de-repudio-a-medida-provisoria-que-diminui-areas-protegidas-na-amazonia.
Illescas, G. 2014. ¿Vecinos de Hidro Santa Rita firman acuerdo con la Empresa y el Gobierno? Centro de Médios Independentes (CMI-6) [Did the neighbors of the Santa Rita Dam sign an accord with the company and with the government? (in Spanish)]. Retrieved August 4, 2014, from http://cmiguate.org/vecinos-de-hidro-santa-rita-firman-acuerdo-con-la-empresa-y-el-gobierno/.
ISA (Instituto Socioambiental). 2013. Dilma homologa terra indígena Kayabi (MT/PA) em meio a atritos por causa de hidrelétricas [Dilma gives final approval to the Kayabi Indigenous Land (MT/PA) in the midst of conflicts caused by dams (in Portuguese)] Notícias Direto do ISA, April 19, 2013. Retrieved April 29, 2013 (17:11:09), from http://www.socioambiental.org/pt-br/noticias-socioambientais/dilma-homologa-terra-indigena-kayabi-mtpa-em-meio-a-atritos-por-causa-de.
ISA (Instituto Socioambiental). 2014. Estado brasileiro é denunciado na OEA por ainda usar lei da ditadura militar [Brazil is denounced in the OAS for still using law from the military dictatorship (in Portuguese)]. Direto do ISA. Retrieved March 28, 2014, from http://www.socioambiental.org/pt-br/noticias-socioambientais/estado-brasileiro-e-denunciado-na-oea-por-ainda-usar-lei-da-ditadura-militar.
Kahn, J.R., C.E. Freitas, and M. Petrere. 2014. False shades of green: The case of Brazilian Amazonian hydropower. Energies 7: 6063–6082. doi:10.3390/en7096063.
Kayabi, Apiaká, and Munduruku. 2011. Manifesto Kayabi, Apiaká e Munduruku contra os aproveitamentos hidrelétricos no Rio Teles Pires [Manifesto of the Kayabi, Apiaká and Munduruku against the hydroelectric dams on the Teles Pires River (in Portuguese)] Aldeia Kururuzinho Terra Indigena Kayabi, Alta Floresta, MT, Brazil. Retrieved, from http://www.internationalrivers.org/files/manifesto%20kayabi-mundurucu-apiaca-dez2011.pdf.
Kayath, H.G. 2010. Processo N 33146-55.2010.4.01.3900. Decisão. Justiça Federal de 1ª Instância, Seção Judiciária do Pará [Case No. 33146-55.2010.4.01.3900 Decision. 1st Jurisdiction, Judicial Section of Pará (in Portuguese)]. Retrieved, from http://telmadmonteiro.blogspot.com.br/2010/12/liminar-suspende-o-processo-de.html.
Kemenes, A., B.R. Forsberg, and J.M. Melack. 2007. Methane release below a tropical hydroelectric dam. Geophysical Research Letters 34: L12809. doi:10.1029/2007GL029479.55.
Leino, T., and M. Lodenius. 1995. Human hair mercury levels in Tucuruí area, state of Pará, Brazil. The Science of the Total Environment 175: 119–125.
Lessa, F. 2012. Justiça manda parar obras de Teles Pires [Courts order halt to construction of Teles Pires Dam (in Portuguese)]. O Estado de São Paulo. Retrieved March 28, 2012, from http://www.estadao.com.br/noticias/impresso,justica-manda-parar-obras-de-teles-pires-,854290,0.htm.
Lourenço, L. 2014. MPF processa União e Funai por demora na demarcação de terra indígena no Pará [Federal Public Ministry sues federal government and Funai for delay in demarcating indigenous land in Pará (in Portuguese)]. Agência Brasil. Retrieved May 27, 2014, from http://amazonia.org.br/2014/05/mpf-processa-uni%c3%a3o-e-funai-por-demora-na-demarca%c3%a7%c3%a3o-de-terra-ind%c3%adgena-no-par%c3%a1/.
Macrologística. 2011. Projeto Norte Competitivo [Competitive North Project (in Portuguese)]. São Paulo, SP: Macrologística Consultaria. Retrieved, from http://www.macrologistica.com.br/images/stories/palestras/Projeto%20Norte%20Competitivo%20-%20Apresentação%20Executiva%20no%20Ministério%20do%20Planejamento%20-%20Agosto%202011.pdf.
McCully, P. 2001. Silenced rivers: The ecology and politics of large dams: Enlarged and updated edition, 359 pp. New York, NY: Zed Books.
Menezes, O. 2012a. Suspensão de liminar ou antecipação de tutela N. OO18625-97.2012.4.01.0000/MT. Decisão. 09 de abril de 2012 [Suspension of provisional order or anticipation of guardianship No. OO18625-97.2012.4.01.0000/MT. Decision. April 9, 2012 (in Portuguese)]. Retrieved, from http://www.prpa.mpf.mp.br/news/2014/arquivos/Suspensao_Liminar.pdf/at_download/file.
Menezes, O. 2012b. Suspensão de liminar ou antecipação de tutela N. 0075621-52.2011.4.01.0000/MT Decisão. 16 de janeiro de 2012 [Suspension of provisional order or anticipation of guardianship No. 0075621-52.2011.4.01.0000/MT Decision. January 16, 2012 (in Portuguese)]. Retrieved, from http://www.prpa.mpf.mp.br/news/2014/arquivos/Suspensao%20de%20Seguranca.doc/at_download/file.
Mermet, L. 2011. Strategic environmental management analysis: Addressing the blind spots of collaborative approaches, 30 pp. Paris: Institut du Développement Durable et des Relations Internationales (IDDRI). Retrieved, from http://www.iddri.org/Publications/Strategic-Environmental-Management-Analysis-Addressing-the-Blind-Spots-of-Collaborative-Approaches.
Millikan, B. 2011. Dams and hidrovias in the Tapajos Basin of Brazilian Amazonia: Dilemmas and challenges for Netherlands–Brazil relations. International Rivers Technical Report, International Rivers, Berkeley, CA. Retrieved, from http://www.bothends.org/uploaded_files/inlineitem/41110615_Int_Rivers_report_Tapajos.pdf.
Millikan, B. 2012. Comments to PJRCES on the Teles Pires Hydropower Project (Brazil). Retrieved, from http://www.internationalrivers.org/node/7188.
Monteiro, T. 2011. Três hidrelétricas ameaçam indígenas no rio Teles Pires [Three hydroelectric dams threaten indigenous people on the Teles Pires River (in Portuguese)]. Retrieved August 22, 2011, from http://telmadmonteiro.blogspot.com.br/2011/08/tres-hidreletricas-ameacam-indigenas-no.html.
Monteiro, T. 2013a. Hidrelétrica São Manoel: Cronologia de mais um desastre—Parte I. [São Manoel Hydroelectric Dam: Chronology of one more disaster—Part 1 (in Portuguese)]. Correio da Cidadania, August 15, 2013, from http://www.correiocidadania.com.br/index.php?option=com_content&view=article&id=8728:submanchete150813&catid=32:meio-ambiente&Itemid=68.
Monteiro, T. 2013b. Hidrelétrica São Manoel: Cronologia de mais um desastre—Parte II [São Manoel Hydroelectric Dam: Chronology of one more disaster—Part II (in Portuguese)]. Correio da Cidadania. Retrieved August 19, 2013, from http://www.correiocidadania.com.br/index.php?option=com_content&view=article&id=8746:submanchete190813&catid=75:telma-monteiro&Itemid=192.
Moreira, P.F. (ed.). 2012. Setor Elétrico Brasileiro e a Sustentabilidade no Século 21: Oportunidades e Desafios, 2a ed. [The Brazilian electrical sector and sustainability in the 21st century, 2nd. Edn. (In Portuguese)], 100 pp. Brasília, DF: Rios Internacionais. Retrieved, from http://www.internationalrivers.org/node/7525.
MPF/PA (Ministério Público Federal no Pará). 2011. MPF/PA: Justiça paralisa usinas de Colíder, Sinop e Magessi, no Teles Pires [Federal Public Ministry in Pará: Courts halt Colíder, Sinop and Magessi Dams on the Teles Pires River (in Portuguese)]. Retrieved, from http://mpf.jusbrasil.com.br/noticias/2957565/mpf-pa-justica-paralisa-usinas-de-colider-sinop-e-magessi-no-teles-pires.
MPF/PA (Ministério Público Federal no Pará). 2012. MP pede suspensão do licenciamento e obras da usina de Teles Pires por falta de consulta a indígenas [Public Ministry requests suspension of licensing construction of the Teles Pires Dam due to lack of consultation with indigenous peoples (in Portuguese)]. Retrieved March 19, 2012, from http://www.prpa.mpf.gov.br/news/2012/mp-pede-suspensao-do-licenciamento-e-obras-da-usina-de-teles-pires-por-falta-de-consulta-a-indigenas.
Oliver-Smith, A. (ed.). 2009. Development and dispossession: The crisis of development forced displacement and resettlement, 344 pp. London: SAR Press.
Oliver-Smith, A. 2010. Defying Displacement: Grassroots Resistance and the Critique of Development, 303. Austin, TX: University of Texas Press.
Ortiz, F. 2013. Índios Munduruku vão à Brasília contra usinas no Tapajós [Munduruku Indians go to Brasília against dams on the Tapajós (in Portuguese)]. OEco. Retrieved December 12, 2013, from http://www.oeco.org.br/noticias/27850-indios-munduruku-vao-a-brasilia-contra-usinas-no-tapajos.
Ostrom, E. 2011. Background on the institutional analysis and development framework. The Policy Studies Journal 39: 7–27. doi:10.1111/j.1541-0072.2010.00394.x.
Palmquist, H. 2014. Usina Teles Pires: Justiça ordena parar e governo federal libera operação, com base em suspensão de segurança. Ponte. Retrieved November 27, 2014, from http://ponte.org/usina-teles-pires-justica-ordena-parar-e-governo-federal-libera-operacao-com-base-em-suspensao-de-seguranca/.
Presser, I. 2014. Processo N° 0017643-16.2013.4.01.3600—1ª Vara Federal Nº de registro e-CVD 00029.2014.00013600.2.00569/00033 [Case No. 0017643-16.2013.4.01.3600—1st Federal Judgeship Registry No. e-CVD 00029.2014.00013600.2.00569/00033 (in Portuguese)]. Cuiabá, MT: Tribunal Regional Federal da Primeira Região. Retrieved April 28, 2014, from http://www.prpa.mpf.mp.br/news/2014/arquivos/liminar.isolados.pdf.
Prudente, A.S. 2013. O terror jurídico-ditatorial da suspensão de segurança e a proibição do retrocesso no estado democrático de direito [Judicial-dictatorial terror—security suspension and the prohibition of delays in the democratic state of law (in Portuguese)]. Revista Magister de Direito Civil e Processual Civil 10: 108–120. Retrieved, from http://www.icjp.pt/sites/default/files/papers/o_terror_juridico_completo.pdf.
Prudente, A.S. 2014. A suspensão de segurança como instrumento agressor dos tratados internacionais [The security suspension as an instrument of aggression against international treaties (in Portuguese)]. Revista Justiça e Cidadania, No. 165. Retrieved, from http://www.editorajc.com.br/2014/05/suspensao-seguranca-instrumento-agressor-tratados-internacionais/.
Ross, K. 2012. Community leader and defender of the Sogamoso River disappears. International Rivers. Retrieved November 12, 2012, from http://www.internationalrivers.org/blogs/259/community-leader-and-defender-of-the-sogamoso-river-disappears.
Santos, S.M.S.B.M., and F.M. Hernandez (ed.). 2009. Painel de Especialistas: Análise Crítica do Estudo de Impacto Ambiental do Aproveitamento Hidrelétrico de Belo Monte, 230 pp. Belém, Pará: Painel de Especialistas sobre a Hidrelétrica de Belo Monte. Retrieved, from http://www.xinguvivo.org.br/wp-content/uploads/2010/10/Belo_Monte_Painel_especialistas_EIA.pdf.
Scudder, T. 2006. The future of large dams: Dealing with social, environmental, institutional and political costs, 408 pp. London, UK: Routledge.
TRF-1 (Tribunal Regional Federal da 1ª Região). 2013. TRF determina a suspensão das obras da UHE Teles Pires até a realização do Estudo do Componente Indígena. Processo n.º 058918120124013600, Data do julgamento: 09/10/13. [Federal Regional Court orders suspension of construction of the Teles Pires Dam until a Study of the Indigenous Component is carried out. Case No. 058918120124013600, Date of judgement: October 9, 2013 (in Portuguese)]. Retrieved, from http://trf-1.jusbrasil.com.br/noticias/112010609/trf-determina-a-suspensao-das-obras-da-uhe-teles-pires-ate-a-realizacao-do-estudo-do-componente-indigena.
TRF-1 (Tribunal Regional Federal da 1ª Região). 2014. Consulta Processual/MT 0013839-40.2013.4.01.3600 [Consultation of legal case/MT 0013839-40.2013.4.01.3600 (in Portuguese)]. Retrieved, from http://processual.trf1.jus.br/consultaProcessual/index.php?secao=MT.
Tundisi, J.G., J. Goldemberg, T. Matsumura-Tundisi, and A.C.F. Saraivad. 2014. How many more dams in the Amazon? Energy Policy 74: 703–708. doi:10.1016/j.enpol.2014.07.013.
Val, A.L., V.M.F. deAlmeida-Val, P.M. Fearnside, G.M. dos Santos, M.T.F. Piedade, W. Junk, S.R. Nozawa, S.T. da Silva, and F.A.C. Dantas. 2010. Amazônia: Recursos hídricos e sustentabilidade [Amazonia: Water resources and sustainability (in Portuguese)]. In Aguas do Brasil: Análises Estratégias, [Waters of Brazil: Strategic analyses (in Portuguese)], ed. C.E.M. Bicudo, J.G. Tundisi, and M.C.B. Scheuenstuhl, 95–109, 222 pp. São Paulo, SP: Instituto de Botânica.
WCD (World Commission on Dams). 2000. Dams and development—A new framework for decision making—the report of World Commission on Dams. WCD and Earthscan, London, 404 pp.
WWF Brasil. 2012. Construção de hidrelétricas ameaça rio Tapajós. [Construction of hydroelectric dams threatens the Tapajós River (in Portuguese)]. Retrieved February 11, 2012, from http://www.wwf.org.br/informacoes/sala_de_imprensa/?30562/construo-de-hidreltricas-ameaa-rio-tapajs.
WWF Brasil. 2014. Hidrelétricas podem alagar parque nacional na Amazônia [Hydroelectric dams could flood national park in Amazonia (in Portuguese)]. Amazônia. Retrieved June 5, 2014, from http://amazonia.org.br/2014/06/hidrel%c3%a9tricas-podem-alagar-parque-nacional-na-amaz%c3%b4nia/.
Yan, K. 2013. World water day marked by death of indigenous anti-dam protester. International Rivers. Retrieved April 4, 2013, from http://www.internationalrivers.org/blogs/246/world-water-day-marked-by-death-of-indigenous-anti-dam-protester.
Acknowledgments
The author’s research is financed exclusively by academic sources: Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq: proc. 2007-1/305880, 304020/9/2010-573810, 2008-7, 575853/2008-5), Fundação de Amparo à Pesquisa do Estado do Amazonas (FAPEAM Proc—708565) and Instituto Nacional de Pesquisas da Amazônia (INPA: JRP 13.03). Part of this text is translated and adapted from (Fearnside 2014a). Zachary Hurwitz, of International Rivers, provided shape files used in Figs. 1, 2, 3, and 4, which were prepared by Marcelo dos Santos. A Portuguese language text presenting the information included here will be available in a compendium to be organized by International Rivers, Brazil on dams in the Tapajós Basin. P.M.L.A. Graça, D. Alarcon, I.F. Brown and two anonymous reviewers provided valuable comments.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Fearnside, P.M. Amazon dams and waterways: Brazil’s Tapajós Basin plans. Ambio 44, 426–439 (2015). https://doi.org/10.1007/s13280-015-0642-z
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s13280-015-0642-z