Advanced Colloids Experiment (ACE)-M-2 Sample Mixing: Commander (CDR) Swanson mixed ACE-M-2 samples in preparation for sample analysis which will take place in the Fluids Integrated Rack (FIR) at a later date. In the ACE-M-2 investigation, a model colloidal system is used to observe the microscopic behavior of liquids and gases separating from each other, near the critical point, via a process called spinodal decomposition.
In Flight Maintenance (IFM): Swanson performed a Waste and Hygiene Compartment (WHC) flush tank fill and depressurized the flush water tank and water valve block to protect the dose pump.
Public Affairs Office (PAO) Event: Swanson participated in a PAO event with middle and high school students. Topics included research being conducted on the ISS and what types of tasks are performed during space walks.
Today’s Planned Tasks
- RSS1,2 Reboot / r/g 1009 [Complete]
- Laptop RS1(2) Reboot [Complete]
- SM ПСС (Caution & Warning Panel) Test [Complete]
- Daily Planning Conference [Complete]
- Terminate EMU METOX Regeneration [Complete]
- OTKLIK. Equipment setup r/g 5684 [Complete]
- Start EMU Metox Regeneration [Complete]
- SM Ventilation System Preventive Maintenance. Group В1 [Complete]
- Flushing ТКГ 421 (AO) Rodnik БВ2 Tank Connectors / r/g 5686 [Complete]
- On MCC Go Urine Transfer from EDV-U to ТКГ 421 Rodnik БВ1 tank (AO) / r/g 5686 [Complete]
- ACE. OBT Review [Complete]
- ACE. Sample 60-Minute Mixing [Complete]
- ACE. Sample 50-Minute Mixing [Complete]
- ACE. Sample 40-Minute Mixing [Complete]
- Filling (separation) of EDV [KOB] for Elektron from ТКГ 427 r/g 5638 [Complete]
- Replace СМОК set between СК1 and СБК1. r/g 5664 [Complete]
- WRS Water Sample Analysis [Complete]
- VEG – Daily Plant Check [Complete]
- VEG – Plant Water Refill [Complete]
- СОЖ Maintenance [Complete]
- VEG – Weekly Plants Photo [Complete]
- WHC Fill [Complete]
- ИП-1 Flow Sensor Position Check / Pressure Control & Atmosphere Monitoring System [Complete]
- On-orbit Hearing Assessment using EARQ [Complete]
- Replace Condensate Removal Lines set from СК1 to ВУ СРВ-К2М. r/g 5664 [Complete]
- ТКГ 421 Stowage Ops / r/g 5685 [Complete]
- JRNL – Journal Entry [Complete]
- MELF1 – Insert Ice Bricks [Complete]
- Dust Filter Replacement and MRM1 Gas-Liquid Heat Exchanger (ГЖТ) Cleaning [Complete]
- MELFI3. Ice Brick Insertion into MELF3 [Complete]
- PAO Hardware Setup [Complete]
- TOCA Data Recording [Complete]
- Daily Planning Conference [Complete]
- IMS Update
- Crew Prep for PAO [Complete]
- PAO Event [Complete]
Task List
- ARED Cylinder Evac
- WHC EDV-U R&R
- Roscosmos Report
- Ekon Photo
- IFM-WHC UR/IF R&R
- 39S CMS pre-gather
- 3DA1-Cam-Ops
- ARED Dashpot inspect
- CEVIS Isolator MOD
- Cygnus pre-gather
- EMU 3005 Photos
- EMU LLB Auto-Init
- EMU LLB SSC Relocate
- EMU LLB SSC Return
- EVA ORU Bag Inspection
- IFM MOOT restow
- IFM NOD1OS2 LHA R&R
- IFM NOD1PD2 LHA R&R
- PEPS Inspect
- No-skid tape audit
- NOD3 PEPS assessment
- P/TV Hardware questions
- POSSUM PL Photo
- PMM cleanup
- Viable Crew OBT
- Viable PL Photo
- Viable PL Touch
- WMRS MRF Remove
Ground
- Nominal commanding
Three-Day Look Ahead:
- Thursday, 05/22: MSL SCA Exchange, Resist Tubule Prep, MELFI Ice brick install
- Friday, 05/23: Crew half duty, Sprint BP/ECG, Resist Tubule samples, move CLPA from SSRMS boom to MBS mast
- Saturday, 05/24: Crew day off, VEG-01 daily check
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Override |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Stop |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Norm |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full up |