ISS Daily Summary Report – 05/17/14

Double Cold Bag (DCB) Packing: ISS CDR Swanson and FE-1 Skvortsov packed six DCBs with conditioned science samples for return on SpaceX-3.

SpaceX-3 Departure Preparations:  Swanson completed the final SpaceX-3 cargo loading.  He then completed the SpaceX-3 egress and vestibule closeout procedures, including installation of the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs).  Finally, he configured the Robotics Work Station (RWS) cameras. SpaceX-3 unberth is scheduled at 6:40am CDT tomorrow with release scheduled at 8:26am CDT.

CBM Bolt 3-1 Checkout:  After Swanson installed the CBM CPAs, the ground team checked out CBM Bolt 3-1, which had failed during SpaceX-3 berthing operations and was subsequently changed out.  The bolt was fully retracted to confirm the initial configuration. It was then driven and retracted to verify nominal operation.  Bolt 3-1 will be masked to support SpaceX-3 demate.

Today’s Planned Tasks

  • SM Caution and Warning Panel (ПСС) [Complete]
  • Laptop RS1(2) reboot [Complete]
  • RSS1,2 reboot r/g 1009 [Complete]
  • Daily Planning Conference (S-band) [Complete]
  • Double Cold Bag Procedure review for Dragon [Complete]
  • OTKLIK. Installation area prep. Tagup with specialist r/g 5654 [Complete]
  • Double Cold Bag Packing to Dragon [Complete]
  • BLB – Checking Biolab Laptop Connection
  • DRAGON Transfer Ops [Complete]
  • СОЖ Maintenance [Complete]
  • Dragon Egress [Complete]
  • Telephone conference with “Russian Cosmos” magazine editor / r/g 5669 [Complete]
  • Dragon – Hatch Closure [Complete]
  • Dragon Vestibule Configuration for Demate [Complete]
  • CPA installation [Complete]
  • Connecting DCP Power Cable for RWS in Cupola and LAB [Complete]
  • Camera Setup to View LAB Remote (RWS) Monitor 3 [Complete]
  • CGBA-4 Powerdown [Complete]
  • CGBA-6 Powerdown [Complete]
  • Daily Planning Conference (S-band) [Complete]
  • VEG – Daily Plant Check [Complete]
  • Video recording for Roscosmos TV studio / r/g 5667
  • USOS Window Shutter Close

Task List

  • ARED Cylinder Evac
  • WHC EDV-U R&R
  • Roscosmos Report
  • Test Operation of МИС on ISS RS
  • Ekon Photo
  • CTB 1048 Relocate
  • Dragon Temp Logger Find [In work]
  • 3DA1-Cam-Ops
  • EMU 3005 Photos
  • EMU LLB Auto-Init
  • EMU LLB SSC Relocate
  • EMU LLB SSC Return
  • EVA ORU Bag Inspection
  • MOOT restow
  • NOD1OS2-LHA R&R
  • NOD1PD2-LHA R&R
  • PEP Inspection
  • WHC UR/IF R&R
  • KTO EDV Audit
  • NOD3 PEPS assessment
  • P/TV Hardware questions
  • POSSUM PL Photo
  • Viable Crew OBT
  • Viable PL Photo
  • Viable PL Touch
  • WMRS MRF Remove

Ground

  • Nominal commanding
  • SpaceX-3 configuration for unberth [Complete]
  • CBM CPA checkout and Bolt 3-1 verification [Complete]

Three-Day Look Ahead:

  • Sunday,  05/18:  Dragon release 8:26am CDT
  • Monday, 05/19:  Crew off duty, Resist Tubule MELFI insert, RADIN
  • Tuesday, 05/20: OGA H2 sensor R&R, SpaceX-3 debrief, MELFI Ice brick install

QUICK ISS Status – Environmental Control Group:

                              Component Status
Elektron On
Vozdukh Manual
[СКВ] 1 – SM Air Conditioner System (“SKV1”) Off
[СКВ] 2 – SM Air Conditioner System (“SKV2”) Off
Carbon Dioxide Removal Assembly (CDRA) Lab Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 Standby
Major Constituent Analyzer (MCA) Lab Stop
Major Constituent Analyzer (MCA) Node 3 Operate
Oxygen Generation Assembly (OGA) Standby
Urine Processing Assembly (UPA) Standby
Trace Contaminant Control System (TCCS) Lab Off
Trace Contaminant Control System (TCCS) Node 3 Full up