Simulation of neutron background for a dark matter search experiment at JUSL
Authors:
S. Banik,
V. K. S. Kashyap,
S. Ghosh,
S. Dutta,
B. Mohanty,
Meghna K. K.,
P. Bhattacharjee,
S. Saha
Abstract:
Dark matter search experiments demand low to ultralow radiation background to operate. It is very important to understand the nature of the radiation background including knowledge about the sources contributing to it. Sometimes, evaluation of the background becomes very specific to the site chosen for the experiment, and also to the experimental configuration. A dark matter search experiment is p…
▽ More
Dark matter search experiments demand low to ultralow radiation background to operate. It is very important to understand the nature of the radiation background including knowledge about the sources contributing to it. Sometimes, evaluation of the background becomes very specific to the site chosen for the experiment, and also to the experimental configuration. A dark matter search experiment is proposed to be set up at the Jaduguda Underground Science Laboratory (JUSL) in India. The laboratory will be located inside an existing mine with 555 m of vertical rock overburden. Neutrons produced from $(α,n)$ reactions, spontaneous fission of natural radioactive impurities in the rocks, and also from cosmic muon induced reactions are considered as the main background which can affect the sensitivity and outcome of the experiment. In this work, simulations based on GEANT4 are done to understand both the radiogenic neutron background caused by natural radioactivity of the surrounding rock and the cosmogenic neutron background due to interaction of the deeply penetrating cosmic muons with the rock. The muon flux in the cavern is obtained to be $4.49(\pm0.25)\times10^{-7} $cm$^{-2}$s$^{-1}$ and the fluxes of radiogenic and cosmogenic neutrons above an energy threshold of 1 MeV in the cavern are obtained to be $5.75(\pm0.58)\times10^{-6}$cm$^{-2}$s$^{-1}$ and $7.25(\pm0.65)\times 10^{-9}$ cm$^{-2}$s$^{-1}$ respectively. The values obtained are comparable with estimates and measurements done for DAMA, WIPP and dark matter experiments at Boulby mine. The effectiveness of different shielding materials are also investigated to obtain the best possible neutron background reduction for a dark matter search experiment at JUSL. We also estimate the sensitivity of a CsI based detector for Weakly Interacting Massive Particle (WIMP) dark matter search at JUSL considering the estimated neutron background.
△ Less
Submitted 10 November, 2020;
originally announced November 2020.
KM3NeT front-end and readout electronics system: hardware, firmware and software
Authors:
The KM3NeT Collaboration,
S. Aiello,
F. Ameli,
M. Andre,
G. Androulakis,
M. Anghinolfi,
G. Anton,
M. Ardid,
J. Aublin,
C. Bagatelas,
G. Barbarino,
B. Baret,
S. Basegmez du Pree,
A. Belias,
E. Berbee,
A. M. van den Berg,
V. Bertin,
V. van Beveren,
S. Biagi,
A. Biagioni,
S. Bianucci,
M. Billault,
M. Bissinger,
P. Bos,
J. Boumaaza
, et al. (215 additional authors not shown)
Abstract:
The KM3NeT research infrastructure being built at the bottom of the Mediterranean Sea will host water-Cherenkov telescopes for the detection of cosmic neutrinos. The neutrino telescopes will consist of large volume three-dimensional grids of optical modules to detect the Cherenkov light from charged particles produced by neutrino-induced interactions. Each optical module houses 31 3-inch photomult…
▽ More
The KM3NeT research infrastructure being built at the bottom of the Mediterranean Sea will host water-Cherenkov telescopes for the detection of cosmic neutrinos. The neutrino telescopes will consist of large volume three-dimensional grids of optical modules to detect the Cherenkov light from charged particles produced by neutrino-induced interactions. Each optical module houses 31 3-inch photomultiplier tubes, instrumentation for calibration of the photomultiplier signal and positioning of the optical module and all associated electronics boards. By design, the total electrical power consumption of an optical module has been capped at seven watts. This paper presents an overview of the front-end and readout electronics system inside the optical module, which has been designed for a 1~ns synchronization between the clocks of all optical modules in the grid during a life time of at least 20 years.
△ Less
Submitted 29 July, 2019; v1 submitted 15 July, 2019;
originally announced July 2019.