-
Absolute Flux Density Calibration of the Greenland Telescope Data for Event Horizon Telescope Observations
Authors:
J. Y. Koay,
K. Asada,
S. Matsushita,
C. -Y. Kuo,
C. -W. L. Huang,
C. Romero-Cañizales,
S. Koyama,
J. Park,
W. -P. Lo,
G. Bower,
M. -T. Chen,
S. -H. Chang,
C. -C. Chen,
R. Chilson,
C. C. Han,
P. T. P. Ho,
Y. -D. Huang,
M. Inoue,
B. Jeter,
H. Jiang,
P. M. Koch,
D. Kubo,
C. -T. Li,
C. -T. Liu,
K. -Y. Liu
, et al. (13 additional authors not shown)
Abstract:
Starting from the observing campaign in April 2018, the Greenland Telescope (GLT) has been added as a new station of the Event Horizon Telescope (EHT) array. Visibilities on baselines to the GLT, particularly in the North-South direction, potentially provide valuable new constraints for the modeling and imaging of sources such as M87*. The GLT's location at high Northern latitudes adds unique chal…
▽ More
Starting from the observing campaign in April 2018, the Greenland Telescope (GLT) has been added as a new station of the Event Horizon Telescope (EHT) array. Visibilities on baselines to the GLT, particularly in the North-South direction, potentially provide valuable new constraints for the modeling and imaging of sources such as M87*. The GLT's location at high Northern latitudes adds unique challenges to its calibration strategies. Additionally, the performance of the GLT was not optimal during the 2018 observations due to it being only partially commissioned at the time. This document describes the steps taken to estimate the various parameters (and their uncertainties) required for the absolute flux calibration of the GLT data as part of the EHT. In particular, we consider the non-optimized status of the GLT in 2018, as well as its improved performance during the 2021 EHT campaign.
△ Less
Submitted 5 December, 2023;
originally announced December 2023.
-
The Greenland Telescope: Antenna Retrofit Status and Future Plans
Authors:
Philippe Raffin,
Paul T. P. Ho,
Keiichi Asada,
Raymond Blundell,
Geoffrey C. Bower,
Roberto Burgos,
Chih-Cheng Chang,
Ming-Tang Chen,
You-Hua Chu,
Paul K. Grimes,
C. C. Han,
Chih-Wei L. Huang,
Yau-De Huang,
Fang-Chia Hsieh,
Makoto Inoue,
Patrick M. Koch,
Derek Kubo,
Steve Leiker,
Lupin Lin,
Ching-Tang Liu,
Shih-Hsiang Lo,
Pierre Martin-Cocher,
Satoki Matsushita,
Masanori Nakamura,
Zheng Meyer-Zhao
, et al. (10 additional authors not shown)
Abstract:
Since the ALMA North America Prototype Antenna was awarded to the Smithsonian Astrophysical Observatory (SAO), SAO and the Academia Sinica Institute of Astronomy & Astrophysics (ASIAA) are working jointly to relocate the antenna to Greenland. This paper shows the status of the antenna retrofit and the work carried out after the recommissioning and subsequent disassembly of the antenna at the VLA h…
▽ More
Since the ALMA North America Prototype Antenna was awarded to the Smithsonian Astrophysical Observatory (SAO), SAO and the Academia Sinica Institute of Astronomy & Astrophysics (ASIAA) are working jointly to relocate the antenna to Greenland. This paper shows the status of the antenna retrofit and the work carried out after the recommissioning and subsequent disassembly of the antenna at the VLA has taken place. The next coming months will see the start of the antenna reassembly at Thule Air Base. These activities are expected to last until the fall of 2017 when commissioning should take place. In parallel, design, fabrication and testing of the last components are taking place in Taiwan.
△ Less
Submitted 9 December, 2016;
originally announced December 2016.
-
The Greenland Telescope (GLT): Antenna status and future plans
Authors:
Philippe Raffin,
Juan Carlos Algaba-Marcos,
Keichi Asada,
Raymond Blundell,
Roberto Burgos,
Chih-Cheng Chang,
Ming-Tang Chen,
Robert Christensen,
Paul K. Grimes,
C. C. Han,
Paul T. P. Ho,
Yau-De Huang,
Makoto Inoue,
Patrick M. Koch,
Derek Kubo,
Steve Leiker,
Ching-Tang Liu,
Pierre Martin-Cocher,
Satoki Matsushita,
Masanori Nakamura,
Hiroaki Nishioka,
George Nystrom,
Scott N. Paine,
Nimesh A. Patel,
Nicolas Pradel
, et al. (7 additional authors not shown)
Abstract:
The ALMA North America Prototype Antenna was awarded to the Smithsonian Astrophysical Observatory (SAO) in 2011. SAO and the Academia Sinica Institute of Astronomy & Astrophysics (ASIAA), SAO's main partner for this project, are working jointly to relocate the antenna to Greenland to carry out millimeter and submillimeter VLBI observations. This paper presents the work carried out on upgrading the…
▽ More
The ALMA North America Prototype Antenna was awarded to the Smithsonian Astrophysical Observatory (SAO) in 2011. SAO and the Academia Sinica Institute of Astronomy & Astrophysics (ASIAA), SAO's main partner for this project, are working jointly to relocate the antenna to Greenland to carry out millimeter and submillimeter VLBI observations. This paper presents the work carried out on upgrading the antenna to enable operation in the Arctic climate by the GLT Team to make this challenging project possible, with an emphasis on the unexpected telescope components that had to be either redesigned or changed. Five-years of inactivity, with the antenna laying idle in the desert of New Mexico, coupled with the extreme weather conditions of the selected site in Greenland have it necessary to significantly refurbish the antenna. We found that many components did need to be replaced, such as the antenna support cone, the azimuth bearing, the carbon fiber quadrupod, the hexapod, the HVAC, the tiltmeters, the antenna electronic enclosures housing servo and other drive components, and the cables. We selected Vertex, the original antenna manufacturer, for the main design work, which is in progress. The next coming months will see the major antenna components and subsystems shipped to a site of the US East Coast for test-fitting the major antenna components, which have been retrofitted. The following step will be to ship the components to Greenland to carry out VLBI and single dish observations. Antenna reassembly at Summit Station should take place during the summer of 2018.
△ Less
Submitted 18 July, 2014;
originally announced July 2014.