The SOFIA Observatory at the Start of Routine Science Operations : Mission capabilities and performance
Authors:
Pasquale Temi,
Pamela M. Marcum,
Erick Young,
Joseph D. Adams,
Sybil Adams,
B. -G. Andersson,
Eric E. Becklin,
Adwin Boogert,
Rick Brewster,
Eric Burgh,
Brent R. Cobleigh,
Steven Culp,
Jim De Buizer,
Edward W. Dunham,
Christian Engfer,
Geoffrey Ediss,
Maura Fujieh,
Randy Grashuis,
Michael Gross,
Edward Harmon,
Andrew Helton,
Douglas Hoffman,
Jeff Homan,
Michael Hutwohl,
Holger Jakob
, et al. (43 additional authors not shown)
Abstract:
The Stratospheric Observatory for Infrared Astronomy (SOFIA) has recently concluded a set of engineering flights for Observatory performance evaluation. These in-flight opportunities are viewed as a first comprehensive assessment of the Observatory's performance and are used to guide future development activities, as well as to identify additional Observatory upgrades. Pointing stability was evalu…
▽ More
The Stratospheric Observatory for Infrared Astronomy (SOFIA) has recently concluded a set of engineering flights for Observatory performance evaluation. These in-flight opportunities are viewed as a first comprehensive assessment of the Observatory's performance and are used to guide future development activities, as well as to identify additional Observatory upgrades. Pointing stability was evaluated, including the image motion due to rigid-body and flexible-body telescope modes as well as possible aero-optical image motion. We report on recent improvements in pointing stability by using an active mass damper system installed on the telescope. Measurements and characterization of the shear layer and cavity seeing, as well as image quality evaluation as a function of wavelength have also been performed. Additional tests targeted basic Observatory capabilities and requirements, including pointing accuracy, chopper evaluation and imager sensitivity. This paper reports on the data collected during these flights and presents current SOFIA Observatory performance and characterization.
△ Less
Submitted 28 May, 2014;
originally announced May 2014.
ALMA North American Integration Center Front-End Test System
Authors:
Geoffrey A. Ediss,
Joshua Crabtree,
Kirk Crady,
Erik Gaines,
Morgan McLeod,
Greg Morris,
Rick Williams,
Antonio Perfetto,
John Webber
Abstract:
The Atacama Large Millimeter/submillimeter (ALMA) Array Front End (FE) system is the first element in a complex chain of signal receiving, conversion, processing and recording. 70 Front Ends will be required for the project. The Front End is designed to receive signals in ten different frequency bands. In the initial phase of operations, the antennas will be fully equipped with six bands. These ar…
▽ More
The Atacama Large Millimeter/submillimeter (ALMA) Array Front End (FE) system is the first element in a complex chain of signal receiving, conversion, processing and recording. 70 Front Ends will be required for the project. The Front End is designed to receive signals in ten different frequency bands. In the initial phase of operations, the antennas will be fully equipped with six bands. These are Band 3 (84-116 GHz), Band 4 (125-163 GHz), Band 6 (211-275 GHz), Band 7 (275-373 GHz), Band 8 (385-500 GHz) and Band 9 (602-720 GHz). It is planned to equip the antennas with the missing bands at a later stage of ALMA operations, with a few Band 5 (163-211 GHz) and Band 10 (787-950 GHz) receivers in use before the end of the construction project.
The ALMA Front End is far superior to any existing receiver systems; spin-offs of the ALMA prototypes are leading to improved sensitivities in existing millimeter and submillimeter observatories. The Front End units are comprised of numerous elements, produced at different locations in Europe, North America and East Asia and are integrated at several Front End integration centers (FEIC) to insure timely delivery of all the units to Chile. The North American FEIC (NA FEIC) is at the National Radio Astronomy Observatory facility in Charlottesville, Virginia, USA.
This paper describes the design and performance of the test set used at the NA FEIC to check the performance of the Front Ends, following integration and prior to shipment to Chile.
△ Less
Submitted 1 September, 2010;
originally announced September 2010.