-
A Long-Baseline Atom Interferometer at CERN: Conceptual Feasibility Study
Authors:
G. Arduini,
L. Badurina,
K. Balazs,
C. Baynham,
O. Buchmueller,
M. Buzio,
S. Calatroni,
J. -P. Corso,
J. Ellis,
Ch. Gaignant,
M. Guinchard,
T. Hakulinen,
R. Hobson,
A. Infantino,
D. Lafarge,
R. Langlois,
C. Marcel,
J. Mitchell,
M. Parodi,
M. Pentella,
D. Valuch,
H. Vincke
Abstract:
We present results from exploratory studies, supported by the Physics Beyond Colliders (PBC) Study Group, of the suitability of a CERN site and its infrastructure for hosting a vertical atom interferometer (AI) with a baseline of about 100 m. We first review the scientific motivations for such an experiment to search for ultralight dark matter and measure gravitational waves, and then outline the…
▽ More
We present results from exploratory studies, supported by the Physics Beyond Colliders (PBC) Study Group, of the suitability of a CERN site and its infrastructure for hosting a vertical atom interferometer (AI) with a baseline of about 100 m. We first review the scientific motivations for such an experiment to search for ultralight dark matter and measure gravitational waves, and then outline the general technical requirements for such an atom interferometer, using the AION-100 project as an example. We present a possible CERN site in the PX46 access shaft to the Large Hadron Collider (LHC), including the motivations for this choice and a description of its infrastructure. We then assess its compliance with the technical requirements of such an experiment and what upgrades may be needed. We analyse issues related to the proximity of the LHC machine and its ancillary hardware and present a preliminary safety analysis and the required mitigation measures and infrastructure modifications. In conclusion, we identify primary cost drivers and describe constraints on the experimental installation and operation schedules arising from LHC operation. We find no technical obstacles: the CERN site is a very promising location for an AI experiment with a vertical baseline of about 100 m.
△ Less
Submitted 2 April, 2023;
originally announced April 2023.
-
Optimizing the use of pressurized bladders for the assembly of HL-LHC MQXFB magnets
Authors:
J. Ferradas Troitino,
G. Ambrosio,
N. Bourcey,
D. Cheng,
A. Devred,
H. Felice,
P. Ferracin,
M. Guinchard,
S. Izquierdo Bermudez,
K. Kandemir,
N. Lusa,
A. Milanese,
S. Mugnier,
J. C. Perez,
E. Todesco,
S. Triquet,
G. Vallone
Abstract:
The use of pressurized bladders for stress control of superconducting magnets was firstly proposed at Lawrence Berkeley National Laboratory (LBNL) in the early 2000s. Since then, the so-called bladders and keys procedure has become one of the reference techniques for the assembly of high-field accelerator magnets and demonstrators. Exploiting the advantages of this method is today of critical impo…
▽ More
The use of pressurized bladders for stress control of superconducting magnets was firstly proposed at Lawrence Berkeley National Laboratory (LBNL) in the early 2000s. Since then, the so-called bladders and keys procedure has become one of the reference techniques for the assembly of high-field accelerator magnets and demonstrators. Exploiting the advantages of this method is today of critical importance for Nb3Sn-based accelerator magnets, whose production requires the preservation of tight stress targets in the superconducting coils to limit the effects of the strain sensitivity and brittleness of the conductor. The present manuscript reports on the results of an experimental campaign focused on the optimization of the bladders and keys assembly process in the MQXFB quadrupoles. These 7.2 m long magnets shall be among the first Nb3Sn cryomagnets to be installed in a particle accelerator as a part of the High Luminosity upgrade of the LHC. One of the main practical implications of the bladders technique, especially important when applied to long magnets like MQXFB, is that to insert the loading keys, the opening of a certain clearance in the support structure is required. The procedure used so far for MQXF magnets involved an overstress in the coils during bladder inflation. The work presented here shows that such an overshoot can be eliminated thanks to additional bladders properly positioned in the structure. This optimized method was validated in a short model magnet and in a full-length mechanical model, becoming the new baseline for the series production at CERN. Furthermore, the results are supported by numerical predictions using Finite Element models.
△ Less
Submitted 23 January, 2023;
originally announced January 2023.
-
Performance of a MQXF Nb3Sn Quadrupole Magnet Under Different Stress Level
Authors:
Susana Izquierdo Bermudez,
Giorgio Ambrosio,
Bernardo Bordini,
Nicolas Bourcey,
Paolo Ferracin,
Jose Ferradas Troitino,
Salvador Ferradas Troitino,
Lucio Fiscarelli,
Jerome Fleiter,
Michael Guinchard,
Franco Mangiarotti,
Juan Carlos Perez,
Eelis Takala,
Ezio Todesco
Abstract:
In a dipole or in a quadrupole accelerator magnet, the displacement of the coil turns induced by the electromagnetic forces can cause quenches limiting the magnet performance. For this reason, an azimuthal preload is applied to avoid azimuthal movements of the coil up to the required operational current. However, several tests showed that accelerator magnets can operate with a partial preload, i.e…
▽ More
In a dipole or in a quadrupole accelerator magnet, the displacement of the coil turns induced by the electromagnetic forces can cause quenches limiting the magnet performance. For this reason, an azimuthal preload is applied to avoid azimuthal movements of the coil up to the required operational current. However, several tests showed that accelerator magnets can operate with a partial preload, i.e. that coil unloading during the ramp does not prevent reaching higher currents. This issue is particularly relevant for Nb3Sn magnets, where the loads applied to the Nb3Sn filaments can reach the degradation limits of critical current. In order to investigate the impact of coil preload on the quench performance, the MQXFS6 short model quadrupole for the High Luminosity Upgrade was tested under an azimuthal preload at 80% of the short sample current, reaching 93% of short sample current at 1.9 K. The preload was then released to 60%, still showing ability to operate in the range of 80-85% of short sample current as required by HL-LHC project. With this lower preload, the ability of going above 90% of short sample was lost, and a significant training appeared above 85%. When the preload was restored to the original 80% value, the magnet reached with few quenches 95% of short sample (13.4 T peak field). Magnetic measurements confirm the larger movement of the coil in the case with lower preload, and agree with finite element simulations.
△ Less
Submitted 25 April, 2022;
originally announced April 2022.
-
Beam impact tests of a prototype target for the Beam Dump Facility at CERN: experimental setup and preliminary analysis of the online results
Authors:
E. Lopez Sola,
M. Calviani,
O. Aberle,
C. Ahdida,
P. Avigni,
M. Battistin,
L. Bianchi,
S. Burger,
J. Busom Descarrega,
J. Canhoto Espadanal,
E. Cano-Pleite,
M. Casolino,
M. A. Fraser,
S. Gilardoni,
S. Girod,
J-L. Grenard,
D. Grenier,
M. Guinchard,
C. Hessler,
R. Jacobsson,
M. Lamont,
A. Ortega Rolo,
M. Pandey,
A. Perillo-Marcone,
B. Riffaud
, et al. (2 additional authors not shown)
Abstract:
The Beam Dump Facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for Light Dark Matter and Hidden Sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safe…
▽ More
The Beam Dump Facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for Light Dark Matter and Hidden Sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safely the 400 GeV/c Super Proton Synchrotron (SPS) beam and to maximize the production of charm and beauty mesons. An average power of 300 kW will be deposited on the target, which will be subjected to unprecedented conditions in terms of temperature, structural loads and irradiation. In order to provide a representative validation of the target design, a prototype target has been designed, manufactured and tested under the SPS fixed-target proton beam during 2018, up to an average beam power of 50 kW, corresponding to 350 kJ per pulse. The present contribution details the target prototype design and experimental setup, as well as a first evaluation of the measurements performed during beam irradiation. The analysis of the collected data suggests that a representative reproduction of the operational conditions of the Beam Dump Facility target was achieved during the prototype tests, which will be complemented by a Post Irradiation Examination campaign during 2020.
△ Less
Submitted 20 November, 2019; v1 submitted 16 September, 2019;
originally announced September 2019.