The onset and dynamics of avalanches in a rotating cylinder: From experimental data to a new geometric model
Authors:
Christopher P. McLaren,
Bernhard J. Leistner,
Sebastian Pinzello,
Eduardo Cano-Pleite,
Christoph R. Müller
Abstract:
Particle image velocimetry has been applied to measure particle velocities on the free surface of a bed of particles within a rotating cylinder during avalanching. The particle velocities were used to examine the validity of existing avalanche models and to propose an alternative model. The movement of particles depends on their location on the surface of the bed: particles located near the center…
▽ More
Particle image velocimetry has been applied to measure particle velocities on the free surface of a bed of particles within a rotating cylinder during avalanching. The particle velocities were used to examine the validity of existing avalanche models and to propose an alternative model. The movement of particles depends on their location on the surface of the bed: particles located near the center of the bed travel the farthest, while the distance travelled decreases at an increasing rate for particles located farther from the center. The start of an avalanche can be determined to a single initiation point, that can also be located on the bottom half of the bed; the avalanche quickly propagates through the entire free surface, with 90% of the surface in motion within 257 ms. The experimental insight is used to formulate a new geometric model, in which three equal sized sections flow down the bed during an avalanche. The predictions of the model are confirmed by experimental mixing measurements.
△ Less
Submitted 1 December, 2021;
originally announced December 2021.
Beam impact tests of a prototype target for the Beam Dump Facility at CERN: experimental setup and preliminary analysis of the online results
Authors:
E. Lopez Sola,
M. Calviani,
O. Aberle,
C. Ahdida,
P. Avigni,
M. Battistin,
L. Bianchi,
S. Burger,
J. Busom Descarrega,
J. Canhoto Espadanal,
E. Cano-Pleite,
M. Casolino,
M. A. Fraser,
S. Gilardoni,
S. Girod,
J-L. Grenard,
D. Grenier,
M. Guinchard,
C. Hessler,
R. Jacobsson,
M. Lamont,
A. Ortega Rolo,
M. Pandey,
A. Perillo-Marcone,
B. Riffaud
, et al. (2 additional authors not shown)
Abstract:
The Beam Dump Facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for Light Dark Matter and Hidden Sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safe…
▽ More
The Beam Dump Facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for Light Dark Matter and Hidden Sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safely the 400 GeV/c Super Proton Synchrotron (SPS) beam and to maximize the production of charm and beauty mesons. An average power of 300 kW will be deposited on the target, which will be subjected to unprecedented conditions in terms of temperature, structural loads and irradiation. In order to provide a representative validation of the target design, a prototype target has been designed, manufactured and tested under the SPS fixed-target proton beam during 2018, up to an average beam power of 50 kW, corresponding to 350 kJ per pulse. The present contribution details the target prototype design and experimental setup, as well as a first evaluation of the measurements performed during beam irradiation. The analysis of the collected data suggests that a representative reproduction of the operational conditions of the Beam Dump Facility target was achieved during the prototype tests, which will be complemented by a Post Irradiation Examination campaign during 2020.
△ Less
Submitted 20 November, 2019; v1 submitted 16 September, 2019;
originally announced September 2019.